Lot Streaming in Hybrid Flow Shop Scheduling
نویسنده
چکیده
Production planning and scheduling play significant roles in manufacturing system operations and different techniques have been used to enhance their performance. Lot streaming has been studied for decades and is shown to accelerate production flow. This research deals with lot streaming in hybrid flow shops. Multiple products are processed in a multi-stage hybrid flow shop with non-identical machines. Sublots can be constant or consistent and intermingling is not allowed. Setups are attached and sequence independent. The problem is to simultaneously determine product sequence and sublots sizes so that the makespan is minimized. The model presented in this thesis is a mixed integer linear programming formulation for solving this problem. Several variations of the model are presented to incorporate different problem settings such as exploitation of variable sublots in the single product problem. Numerical examples are presented to validate the proposed model and to compare it to similar example problems in the literature. Furthermore, an example of a lot streaming problem in a general multi-stage hybrid flow shop is concerned and discussions and analysis are presented.
منابع مشابه
Hybrid algorithms for Job shop Scheduling Problem with Lot streaming and A Parallel Assembly Stage
In this paper, a Job shop scheduling problem with a parallel assembly stage and Lot Streaming (LS) is considered for the first time in both machining and assembly stages. Lot Streaming technique is a process of splitting jobs into smaller sub-jobs such that successive operations can be overlapped. Hence, to solve job shop scheduling problem with a parallel assembly stage and lot streaming, deci...
متن کاملCustomer Order Scheduling with Job-Based Processing and Lot Streaming In A Two-Machine Flow Shop
This paper considers a customer order scheduling (COS) problem in which each customer requests a variety of products processed in a two-machine flow shop. A sequence-independent attached setup for each machine is needed before processing each product lot. We assume that customer orders are satisfied by the job-based processing approach in which the same products from different customer orders f...
متن کاملModelling and Scheduling Lot Streaming Flexible Flow Lines
Although lot streaming scheduling is an active research field, lot streaming flexible flow lines problems have received far less attention than classical flow shops. This paper deals with scheduling jobs in lot streaming flexible flow line problems. The paper mathematically formulates the problem by a mixed integer linear programming model. This model solves small instances to optimality. Moreo...
متن کاملA Genetic Algorithm for Lot-Streaming
A hybrid genetic algorithm (HGA) approach is proposed for a lot-streaming flow shop scheduling problem, in which a job (lot) is split into a number of smaller sublots so that successive operations can be overlapped. The objective is the minimization of the mean weighted absolute deviation of job completion t imes from due dates.
متن کاملCritical Path Method for Flexible Job Shop Scheduling Problem with Preemption
This paper addressed a Flexible Job shop Scheduling Problem (FJSP) with the objective of minimization of maximum completion time (Cmax) which job splitting or lot streaming is allowed. Lot streaming is an important technique that has been used widely to reduce completion time of a production system. Due to the complexity of the problem; exact optimization techniques such as branch and bound alg...
متن کامل