A Simple Real-time Beam Tuning Program for the Kekb Injector Linac

نویسندگان

  • J. W. Flanagan
  • K. Oide
  • N. Akasaka
  • A. Enomoto
  • K. Furukawa
  • T. Kamitani
  • H. Koiso
  • Y. Ogawa
  • S. Ohsawa
  • T. Suwada
چکیده

A simple real-time beam tuning program has been developed for use at the KEK B-Factory injector linac. The program features the ability to adjust an arbitrary combination of parameters (e.g. magnet currents and RF phases) in order to optimize an arbitrary combination of monitor values (e.g. the ratio of a downstream beam current to gun current). Based on the downhill-simplex method[2][?], it requires no knowledge of beamline details. An additional ”persistence” parameter is used to adjust the treatment of pulse-to-pulse variations of monitor values while mapping the parameter-space terrain, and controls the peak-holding performance in the presence of both statistical fluctuations and long-term drift. Preliminary results from the commissioning of the KEKB injector linac and plans for the future are discussed.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Recalibration of a Wall-current Monitor Using a Faraday Cup for the Kekb Injector Linac

An absolute beam-charge measurement of single-bunch electron beams with a pulse width of 10 ps and shortpulsed electron beams with a pulse width of 1 ns was performed by the beam test for the KEKB injector linac using a Faraday cup. A wall-current monitor was directly recalibrated by the beam test with an error of ±2%.

متن کامل

Plc-based Beam Charge Interlock System for Radiation Safety in the Kekb Injector Linac

A new PLC-based beam charge interlock system is under development for radiation safety and machine protection in the KEKB injector linac. This system restricts integrated amounts of beam charges passing through several locations along the linac before they are injected into four different storage rings (KEKB ee storage rings, PF, PF-AR). The beam charges are measured using wall current monitors...

متن کامل

Commissioning Status of the Kekb Linac

After entering into the full-commissioning phase of the KEKB linac in May, 1998, we have established two linac injection modes for the KEKB ring: an 8-GeV electron beam and a 3.5-GeV positron beam, as well as beam modes for the rings of the synchrotron light sources. All modes are easily switched for almost one minute without any trouble. The linac beam characteristics have been substantially i...

متن کامل

Beam Feedback Systems and Bpm Read-out System for the Two-bunch Acceleration at Kekb Linac

In order to double the positron injection rate into the KEKB ring, a two-bunch acceleration scheme has been studied at the linac, in which bunches separated by 96 ns are accelerated in 50 Hz. In this scheme the stabilization of energy and orbit of each bunch is indispensable. Thus the beam energy and orbit feedback systems have been upgraded. Since beam characteristics are acquired through beam...

متن کامل

The Kekb Bucket Selection System - Recent Progress and the Plan in the near Future

The KEKB bucket selection system, which enables us to realize a variety of bunch fill-patterns in the KEKB rings, has been working well since the start of the commissioning of KEKB in Dec. 1998. Although the hardware of the system has not changed since the start of the machineoperation, its software is continuously evolving, in order to meet the requirements from the view-point of more sophisti...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2000