A New Equation for the Load Balance Scheduling Based on the Smarandache F-inferior Part Function

نویسندگان

  • Tatiana Tabirca
  • Sabin Tabirca
چکیده

This article represerts an extension of [rabirca, 2000aJ. A new equation for upper bOlDlds is obtained based on the Smarandache f-inferior part function. An example involving tpper diagonal matrices is given in order to illustrate that the new equation provide a better computation.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A PARALLEL LOOP SCHEDULING ALGORITHM BASED ON THE SMARANDACHEf-INFERIOR PART FUNCTION

This article presents an application of the inferior Smarandache f-part function to a particular parallel loop-scheduling problem. The product between an upper diagonal matrix and a vector is analysed from parallel computation point of view. An efficient solution for this problem is given by using the inferior Smarandache I-part function. Finally, the efficiency of our solution is proved experi...

متن کامل

DEVELOPING THE LSM VPR SCHEDULING METHOD FOR SCHEDULING HIGHWAY CONSTRUCTION PROJECTS BASED ON EFFECTIVE FACTORS ON EMBANKMENT ACTIVITY PRODUCTIVITY

Highway construction projects are one of the most important construction projects in the world. Therefore predicting the time of these kinds of projects is important. Basically highway projects are including few activities which are repeating along the horizontal direction. One of the best methods for scheduling these types of projects is linear scheduling method. The repetitive nature of the h...

متن کامل

A Novel Adapted Multi-objective Meta-heuristic Algorithm for a Flexible Bi-objective Scheduling Problem Based on Physics Theory

  We relax some assumptions of the traditional scheduling problem and suggest an adapted meta-heuristic algorithm to optimize efficient utilization of resources and quick response to demands simultaneously. We intend to bridge the existing gap between theory and real industrial scheduling assumptions (e.g., hot metal rolling industry, chemical and pharmaceutical industries). We adapt and evalua...

متن کامل

برنامه‌ریزی همزمان انرژی و ذخیره‌ کنترل فرکانس اولیه با لحاظ کردن قابلیت‌های فنی واحدهای نیروگاهی پیشرفته

Load frequency control includes the operating system and functions that provide real time balance of load and generation. On the other hand, depending on technical capabilities and operational constraints, generating units may be classified for participating in frequency control. Simultaneous scheduling of generation together with primary reserve, in market based power system, has been investig...

متن کامل

A New Solution for the Cyclic Multiple-Part Type Three-Machine Robotic Cell Problem based on the Particle Swarm Meta-heuristic

In this paper, we develop a new mathematical model for a cyclic multiple-part type threemachine robotic cell problem. In this robotic cell a robot is used for material handling. The objective is finding a part sequence to minimize the cycle time (i.e.; maximize the throughput) with assumption of known robot movement. The developed model is based on Petri nets and provides a new method to calcul...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2000