Neighbourhood Constraint for a Tabu Search Algorithm to Schedule Jobs on Unrelated Parallel Machines
نویسندگان
چکیده
This work deals with the problem of scheduling n independent jobs on m unrelated parallel machines with the objective of minimizing the makespan (the total elapsed time from the start of execution until all jobs have been completed). Preemption is not allowed. This way a job, once assigned to a particular machine, may not be removed until it has finished its execution. All the machines start working on the jobs simultaneously. This problem, according with classification described in [4], can be represented as scheduling problem R || Cmax. The R || Cmax is known to be NP-hard [2, 4], and therefore, very unlikely to find an optimal solution in polinomial time.
منابع مشابه
Solving the Problem of Scheduling Unrelated Parallel Machines with Limited Access to Jobs
Nowadays, by successful application of on time production concept in other concepts like production management and storage, the need to complete the processing of jobs in their delivery time is considered a key issue in industrial environments. Unrelated parallel machines scheduling is a general mood of classic problems of parallel machines. In some of the applications of unrelated parallel mac...
متن کاملSolving the Problem of Scheduling Unrelated Parallel Machines with Limited Access to Jobs
Nowadays, by successful application of on time production concept in other concepts like production management and storage, the need to complete the processing of jobs in their delivery time is considered a key issue in industrial environments. Unrelated parallel machines scheduling is a general mood of classic problems of parallel machines. In some of the applications of unrelated parallel mac...
متن کاملEffectiveness of Adaptive Crossover Procedures for a Genetic Algorithm to Schedule Unrelated Parallel Machines with Setups
The unrelated parallel machine scheduling problem, in its most general form, is applicable to many manufacturing and service environments. This problem requires the scheduling of a group of independent jobs on unrelated parallel machines as well as the sequencing of the jobs on each individual machine. In this paper, we propose a genetic algorithm with adaptive crossover selection to schedule ...
متن کاملSolving a New Multi-objective Unrelated Parallel Machines Scheduling Problem by Hybrid Teaching-learning Based Optimization
This paper considers a scheduling problem of a set of independent jobs on unrelated parallel machines (UPMs) that minimizesthe maximum completion time (i.e., makespan or ), maximum earliness ( ), and maximum tardiness ( ) simultaneously. Jobs have non-identical due dates, sequence-dependent setup times and machine-dependentprocessing times. A multi-objective mixed-integer linear programmi...
متن کاملA bi-objective model for a scheduling problem of unrelated parallel batch processing machines with fuzzy parameters by two fuzzy multi-objective meta-heuristics
This paper considers a bi-objective model for a scheduling problem of unrelated parallel batch processing machines to minimize the makespan and maximum tardiness, simultaneously. Each job has a specific size and the data corresponding to its ready time, due date and processing time-dependent machine are uncertain and determined by trapezoidal fuzzy numbers. Each machine has a specific capacity,...
متن کامل