Stable performance of non‐aerated two‐stage partial nitritation/anammox (PANAM) with minimal process control

نویسندگان

  • Samik Bagchi
  • Rima Biswas
  • Siegfried E. Vlaeminck
  • Kunal Roychoudhury
  • Tapas Nandy
چکیده

Partial nitritation/anammox (PANAM) technologies have rapidly developed over the last decade, but still considerable amounts of energy are required for active aeration. In this study, a non-aerated two-stage PANAM process was investigated. In the first-stage upflow fixed-film bioreactor, nitratation could not be prevented at ammonium loading rates up to 186 mg N l(-1) d(-1) and low influent dissolved oxygen (0.1 mg O(2) l(-1)). Yet, increasing the loading rate to 416 and 747 mg N l(-1) d(-1) by decreasing the hydraulic retention time to 8 and 5 h, respectively, resulted in partial nitritation with the desired nitrite to ammonium nitrogen ratio for the subsequent anammox stage (0.71-1.05). The second-stage anammox reactor was established with a synthetic feeding based on ammonium and nitrite. After establishing anammox at low biomass content (0.5 g VSS l(-1)), the anammox influent was switched to partial nitritation effluent at a loading rate of 71 mg N l(-1) d(-1), of which 78% was removed at the stoichiometrically expected nitrite to ammonium consumption ratios (1.19) and nitrate production to ammonium consumption ratio (0.24). The combined PANAM reactors were operated for 3 months at a stable performance. Overall, PANAM appeals economically, saving about 50% of the energy costs, as well as technically, given straightforward operational principles.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Partial nitritation ANAMMOX in submerged attached growth bioreactors with smart aeration at 20 °C.

Submerged attached growth bioreactors (SAGBs) were operated at 20 °C for 30 weeks in smart-aerated, partial nitritation ANAMMOX mode and in a timer-controlled, cyclic aeration mode. The smart-aerated SAGBs removed 48-53% of total nitrogen (TN) compared to 45% for SAGBs with timed aeration. Low dissolved oxygen concentrations and cyclic pH patterns in the smart-aerated SAGBs suggested conditions...

متن کامل

In-situ restoration of one-stage partial nitritation-anammox process deteriorated by nitrate build-up via elevated substrate levels

The one-stage partial nitritation and anammox process (PN/A) has been a promising microbial process to remove ammonia from wastewater especially with low carbon/nitrogen ratio. The main breakdown was the deterioration caused by overgrowth of nitrite oxidizing bacteria (NOB) resulting effluent nitrate build-up in the PN/A process. This study presented an in-situ restoring strategy for suppressin...

متن کامل

Partial Nitritation/anammox and Canon – Nitrogen Removal Systems Followed by Conductivity Measurements

The deammonification process is a new biological promising method for a separate treatment of ammonium-rich digester supernatant. Its application can significantly reduce the nitrogen load in Wastewater Treatment Plants (WWTPs). The method is a two-step process and it can be accomplished in two separate stages (partial nitritation and Anammox) or in a singe one (CANON). Both these systems were ...

متن کامل

Integrating landfill bioreactors, partial nitritation and anammox process for methane recovery and nitrogen removal from leachate

A new process consisting of a landfill bioreactor, partial-nitritation (PN) and the anammox process has been developed for landfill leachate treatment. In this study, the landfill bioreactor exhibited excellent performance in methane-rich biogas recovery, with a specific biogas yield of 0.47 L gas g(-1) COD and methane percentages of 53-76%. PN was achieved in the aerobic reactor by high free a...

متن کامل

Optimization of a mainstream nitritation-denitritation process and anammox polishing.

This paper deals with an almost 1-year long pilot study of a nitritation-denitritation process that was followed by anammox polishing. The pilot plant treated real municipal wastewater at ambient temperatures. The effluent of high-rate activated sludge process (hydraulic retention time, HRT=30 min, solids retention time=0.25 d) was fed to the pilot plant described in this paper, where a constan...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره 5  شماره 

صفحات  -

تاریخ انتشار 2012