Ramp meters on trial: Evidence from the Twin Cities metering holiday
نویسندگان
چکیده
Ramp meters in the Twin Cities have been the subject of a recent test of their effectiveness, involving turning them off for eight weeks. This paper analyzes the results with and without ramp metering for several representative freeways during the afternoon peak period. Seven performance measures: mobility, equity, productivity, consumers’ surplus, accessibility, travel time variation and travel demand responses are compared. It is found that ramp meters are particularly helpful for long trips relative to short trips. Ramp metering, while generally beneficial to freeway segments, may not improve trip travel times (including ramp delays). The reduction in travel time variation comprises another benefit from ramp meters. Non-work trips and work trips respond differently to ramp meters. The results are mixed, suggesting a more refined ramp control algorithm, which explicitly considers ramp delay, is in order. 2006 Elsevier Ltd. All rights reserved.
منابع مشابه
Ramp Meters on Trial: Evidence from the Twin Cities Ramp Meters Shut-off
Ramp meters in the Twin Cities have been the subject of a recent test of their effectiveness, involving turning them off for 8 weeks. This paper analyzes the results with and without ramp metering for several representative freeways during the afternoon peak period, depending on data availability. Seven performance measures: accessibility, mobility, equity, productivity, consumer surplus, trave...
متن کاملEVALUATING EFFECTIVENESS OF RAMP METERS Evidence from the Twin Cities Ramp Meter Shut-off
Ramp meters in the Twin Cities have been turned off for eight weeks in fall 2000 in an experiment testing their effectiveness. This chapter analyzes the data collected during the experiment on several representative freeways during the afternoon peak period. Several performance measures for ramp metering including mobility, equity, consumers’ surplus, productivity, accessibility, and travel tim...
متن کاملRamp Metering and Freeway Bottleneck Capacity
This study aims to determine whether ramp meters increase the capacity of active freeway bottlenecks. The traffic flow characteristics at twenty-seven active bottlenecks in the Twin Cities have been studied for seven weeks without ramp metering and seven weeks with ramp metering. A methodology for systematically identifying active freeway bottlenecks in a metropolitan area is proposed, which re...
متن کاملMeasuring the Equity and Efficiency of Ramp Meters
The general purpose of this study is to develop both efficient and equitable freeway ramp control strategies. Measures of efficiency and equity for ramp meters are defined and applied to data collected in the Twin Cities ramp metering shut-off experiment. A trade-off between efficiency and equity is evident from the results of data analysis. A new time-dependent optimization program for the glo...
متن کاملRamp Metering and the Capacity of Active Freeway Bottlenecks
The objective of this study is to determine whether ramp meters increase the capacity of active freeway bottlenecks, and if they do, how. The traffic flow characteristics at twenty-seven active bottlenecks in the Twin Cities have been studied for seven weeks without ramp metering and seven weeks with ramp metering. A series of hypotheses regarding the relationships between ramp metering and the...
متن کامل