Modularization Modeling for Real - Time Simulation of Hydropower Plants

نویسنده

  • Chengming WU
چکیده

A modularization method has been proposed here for the full scope real-time simulation of a large-scale hydropower plant. In this method, the full scope dynamic simulation model can be decomposed into several subsystems that can be calculated independently in every time step, and each kind of subsystem model is developed to be a standard module. Using object-oriented modeling method for the simulation of hydropower plant protection systems, a general relaying module is developed to model a versatile protective relay, and a specific protective relay can be modeled through initialization of the general relaying module with different specific parameters and coordination settings. By doing these, the simulation time is reduced considerably, and the full scope simulation model of hydropower plant is convenient to develop, modify and maintain.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Simulation Modeling for Electrical Switching System of Hydropower Station

This paper proposes a simulation modeling method for the electrical switching system of hydropower station, which is a sub-topic for Hydropower Station Simulation Training System. The graphics model of commonly used electrical switch equipment is developed with a certain software [1]. As vast and different types of Hydropower station circuit breakers and associated grounding switches, and each ...

متن کامل

Preliminary Site Selection of Pumped Storage Hydropower Plants - A GIS-based approach

The first stage in development and design of Pumped Storage Hydropower Plants (PSHP) is finding the optimum location. This paper presents a methodology for preliminary site selection of PSHP with the help of geospatial data analysis in a Geographic Information System (GIS) environment. The conventional method of PSHP site selection has certain limitations and is not cost and time effective. The...

متن کامل

Object-Oriented Modelling of Small Hydropower Plants

The improvement of the exploitation of energy resources in power stations is a topic of growing interest. However, experimentation costs in order to increase productivity are very high, either because the possible equipment to change would be very expensive, or simply, because the plant would have to stop. In such cases, the simulation is a fast and cheap way to analyze the power plant behavior...

متن کامل

Application of real-time simulation for hydropower plants monitoring

The global emission ofCO2 has increased in the sector of power generation from countries outside the OECD, particularly in China which comprises two-third of the share. Meanwhile, OECD countries focus their effort in reducing their emission, where the industry area declined their emission by a quarter. Consequently, governments set up energy policies where renewable-based energies such as solar...

متن کامل

An Overview of Hydroelectric Power Plant: Operation, Modeling, and Control

Renewable energy provides twenty percent of electricity generation worldwide. Hydroelectric power is the cheapest way to generate electricity today. It is a renewable source of energy and provides almost one-fifth of electricity in the world. Also, it generates electricity using a renewable natural resource and accounting for six percent of worldwide energy supply or about fifteen percent of th...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2008