Extraction and Backfill Scheduling in a Complex Underground Mine
نویسندگان
چکیده
We use mathematical optimization to determine a production schedule (i.e., a schedule of extraction and subsequent filling of the voids) for a complex underground mine in Ireland. The goal of the mining operation is to maximize metal production over the life of the mine, subject to constraints on maximum monthly extraction and backfilling quantities, maximum and minimum monthly metal production, and sequencing between extraction and backfilling operations. We solve our integer programming model with a heuristic to produce a schedule that adds value to the mining operation by (1) shifting metal production forward, (2) reducing waste mining and backfilling delays, (3) avoiding expensive mill-halting drops in ore production, and (4) enabling smoother workforce management.
منابع مشابه
AN OPTIMIZATION-BASED DECOMPOSITION HEURISTIC FOR SOLVING COMPLEX UNDERGROUND MINE SCHEDULING PROBLEMS by
Underground mine production scheduling possesses mathematical structure similar to and yields many of the same challenges as general scheduling problems. That is, binary variables represent the time at which various activities are scheduled. Typical objectives seek to minimize costs or some measure of production time, or to maximize net present value; two principal types of constraints exist: (...
متن کاملReliability analysis and design of backfill in a cut-and-fill mining method
In underground mining, hydraulic backfill materials, such as waste tailings, river sand, and cement, are often used to fill underground mined stopes. In cut-and-fill mining methods with blasthole stoping and delayed backfill, after extraction of adjacent pillars that contain economic minerals, the backfill is often subject to exposure of free standing on at least one side. A key concern for min...
متن کاملMine Backfill, an Operator's Guide. an Interactive Cd-rom for Mine Operators and Engineers
“Mine Backfill, An Operator’s Guide” is an extension of the electronic book on CD-ROM entitled “Mine Backfill 1998”, which was prepared for the CIM’s (Canadian Institute of Mining, Metallurgy, and Petroleum) centennial celebrations in 1999. Discussions with many operations revealed that there was an industry need for a backfill guide for front-line operator training and as a reference manual fo...
متن کاملCauses and Prevention for Sinkhole in Limestone Mine
In recent, the placement of backfill in underground mines has emerged as a new paradigm in research as it not only improves safety but also allows disposal of byproducts including coal ash. In this regards, this paper addresses the backfilling challenges in limestone mine to prevent sinkhole and subsidence. Limestone mines, generally regarded as being safer than coal and metal mines, have been ...
متن کاملDetermination of a suitable extraction equipment in mechanized longwall mining in steeply inclined coal seams using fuzzy analytical hierarchy method (Case study: Hamkar coal mine, Iran)
The longwall mining method is one of the most applied methods in extracting low-inclined to high-inclined coal seams. Selection of the most suitable extraction equipment is very important in the economical, safety, and productivity aspects of mining operations. There are a lot of parameters affecting the selection of an extraction equipment in mechanized longwall mining in steeply inclined coal...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- Interfaces
دوره 44 شماره
صفحات -
تاریخ انتشار 2014