Optimizing the Injection Straight of PEP II Asymmetric B Factory at SLAC*

نویسنده

  • F. Bulos
چکیده

The power of the SLC linac, as a source for both elec-.trons &d po&rons, was demonstrated in the conceptual design report-(CDR) [l] (also see Table 1). A brief overview of the whole injection system is given in ReferenceJZ}. Figure 1 is a schematic of the system. One can divide the injection system into two main parts. The first is the extraction of e-e+ from the linac and their bypass lines leading to and matching into the existing NIT and SIT lines used in PEP The second is the injection straight, its optics and various components required for injection and matching into the main rings (HER, LER). The latter is the subject of this paper.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Last Year of Pep-ii B-factory Operation*

The PEP-II B-Factory [1] at SLAC (3.1 GeV e + x 9.0 GeV e ) operated from 1999 to 2008, delivering luminosity to the BaBar experiment. The design luminosity was reached after one and a half years of operation. In the end PEP-II surpassed by four times its design luminosity reaching 1.21 x 10 34 cm -2 s -1 . It also set stored beam current records of 2.1 A e and 3.2 A e + . Continuous injection ...

متن کامل

Babar - the Detector for the Pep Ii B Factory at Slac

BABAR refers to the detector that is being designed for the PEP II B-Factory at SLAC to perform a comprehensive study of CP violation in B meson decays. The design requirements and the principal detector components are briefly described. A summary of the expected physics performance is presented.

متن کامل

Measurements of the CKM angle γ at BABAR

The recent measurements of the CKM angle γ by the BABAR experiment are reported. The analyses have been performed using the complete sample of 468 million BB pairs collected by the BABAR detector at the SLAC PEP-II asymmetric-energy B factory during the years 1999-2007.

متن کامل

DIRC for a Higher Luminosity B Factory

The Dirc, a novel type of Cherenkov ring imaging device, is the primary hadronic particle identification system for the BABAR detector at the asymmetric B-factory Pep-II at SLAC. It is based on total internal reflection and uses long, rectangular bars made from synthetic fused silica as Cherenkov radiators and light guides. BABAR began taking data with colliding beams in late spring 1999. This ...

متن کامل

PEP-II Status Report

The main design features of the PEP-II asymmetric two-ring electronpositron B Factory collider, built at the Stanford Linear Accelerator Center, are described. This facility will complete construction in June 1998. The high energy ring, completed in May 1997, has had 3 months of commissioning and successfully stored 0.75 A of electrons. The success of the high energy ring testing validates not ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 1992