A medical equipment replacement model.
نویسنده
چکیده
A simple mathematical model has been developed to identify and prioritize medical equipment in need of replacement. The model contains a total of ten attributes addressing four primary replacement issues: equipment service and support; equipment function; cost benefits; and clinical efficacy. Sensitivity to incomplete or subjective data is significantly reduced through the use of a "yes-no" (0,1) scoring scheme. Decision-making validity does not appear to be compromised with such a technique. When tested on a sample of 146 medical devices in five different categories, the model recommended that two devices be replaced within the existing fiscal year and eight in the following year, and that fifteen devices be placed in an advisory category. The model's recommendations appear to be compatible with existing subjective criteria.
منابع مشابه
Prioritize Medical Equipment Replacement Using Analytical Hierarchy Process
Clinical Engineering Department in hospitals need to take decision for Health Care Technology assessment which includes purchase, maintenance, use, and replacement. In this paper we proposed a analytical hierarchy processes -group decision making (AHP-GDM) model to prioritize the medical equipment for replacement. The model structure includes 11 quantitative and qualitative factors descending a...
متن کاملReliability Based Optimal Preventive Maintenance Policy for High Voltage Circuit Breakers in Power Plants
Electric power industry have always try to provide reliable electricity to customers and at the same time decrease system costs. High Voltage circuit-breakers are an essential part of the power network. This study has developed a maintenance and replacement scheduling model for high voltage circuit- breakers that minimize maintenance costs while maintaining the acceptable reliability. This mo...
متن کاملMaintenance management decision model for preventive maintenance strategy on production equipment
In industries, Preventive Maintenance (PM) is not a new practice to minimise the sudden breakdown of production machine. PM will be performed at predetermine intervals to provide a balance between failure cost and component utilisation (aging). However, most of PM interval is based on experience or original equipment manufacturer (OEM) recommendations. Consequently, the benefits from PM are not...
متن کاملAn ANP and MULTIMOORA-Based SWOT Analysis for Strategy Formulation
Since no organization can have unlimited resources, strategists should decide on a strategy that can provide the greatest benefits to the organization. Decisions on strategy formulation commit the organization to produce specific products, work in specific markets, and exploit certain resources and technologies for a relatively long time. Strategies dictate the long-term competitive advantages ...
متن کاملStudy of the process of maintaining medical equipment in Iranian blood centers
Abstract Background and Objectives Preventive maintenance plays a crucial role in ensuring continuous operation and increasing the accuracy and safety of medical equipment. The existence of this system can significantly reduce the cost of the repair and replacement. In this study, the effectiveness of the maintenance of medical equipment of 7 blood centers was evaluated in Tehran, Karaj, Gilan,...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- Journal of clinical engineering
دوره 17 1 شماره
صفحات -
تاریخ انتشار 1992