Implementing a parametric maximum flow algorithm for optimal open pit mine design under uncertain supply and demand

نویسندگان

  • Mohammad Waqar Ali Asad
  • Roussos G. Dimitrakopoulos
چکیده

Conventional open pit mine optimization models for designing mining phases and ultimate pit limit do not consider expected variations and uncertainty in metal content available in a mineral deposit (supply) and commodity prices (market demand). Unlike the conventional approach, a stochastic framework relies on multiple realizations of the input data so as to account for uncertainty in metal content and financial parameters, reflecting potential supply and demand. This paper presents a new method that jointly considers uncertainty in metal content and commodity prices, and incorporates time-dependent discounted values of mining blocks when designing optimal production phases and ultimate pit limit, while honouring production capacity constraints. The structure of a graph representing the stochastic framework is proposed, and it is solved with a parametric maximum flow algorithm. Lagragnian relaxation and the subgradient method are integrated in the proposed approach to facilitate producing practical designs. An application at a copper deposit in Canada demonstrates the practical aspects of the approach and quality of solutions over conventional methods, as well as the effectiveness of the proposed stochastic approach in solving mine planning and design problems. Journal of the Operational Research Society advance online publication, 25 April 2012 doi:10.1057/jors.2012.26

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Open pit limit optimization using dijkstra’s algorithm

In open-pit mine planning, the design of the most profitable ultimate pit limit is a prerequisite to developing a feasible mining sequence. Currently, the design of an ultimate pit is achieved through a computer program in most mining companies. The extraction of minerals in open mining methods needs a lot of capital investment, which may take several decades. Before the extraction, the p...

متن کامل

A comparison between effects of earthquake and blasting on stability of mine slopes: a case study of Chadormalu open-pit mine

Dynamic slope stability in open-pit mines still remains a challenging task in the computational mining design. Earthquake and blasting are two significant sources of dynamic loads that can cause many damages to open-pit mines in active seismic areas and during exploitation cycles. In this work, the effects of earthquake and blasting on the stability of the NW slope of Chadormalu mine are compar...

متن کامل

An imperialist competitive algorithm for solving the production scheduling problem in open pit mine

Production scheduling (planning) of an open-pit mine is the procedure during which the rock blocks are assigned to different production periods in a way that the highest net present value of the project achieved subject to operational constraints. The paper introduces a new and computationally less expensive meta-heuristic technique known as imperialist competitive algorithm (ICA) for long-term...

متن کامل

A Two-Phase Simulation-Based Optimization of Hauling System in Open-Pit Mine

One of the key issues in mining is the hauling system. Truck and shovels are the most widely used transportation equipment in mines. In this paper, a two-phase simulation-based optimization is presented to maximize utilization of hauling system in the largest Iranian open-pit copper mine. In the first phase, The OptQuest for Arena software package was used to solve the optimization problem to p...

متن کامل

A Hybrid Fuzzy MCDM Approach to Determine an Optimal Block Size in Open-Pit Mine Modeling: a Case Study

The computer-based 3D modeling of ore bodies is one of the most important steps in the resource estimation, grade determination, and production scheduling of open-pit mines. In the modeling phase, the volume of the orebody model is required to be filled by the blocks and sub-blocks. The determination of Block Size (BS) is important due to the dependence of the geostatistical issues and calculat...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • JORS

دوره 64  شماره 

صفحات  -

تاریخ انتشار 2013