Modeling and Analysis of Three-Stage Transfer Lines with Unreliable Machines and Finite Buffers

نویسندگان

  • Stanley B. Gershwin
  • Irvin C. Schick
چکیده

This paper models and analyzes multi-stage transfer lines with unreliable machines and finite buffers. The machines have exponential operation, failure, and repair processes. First, a mixed vector–scalar Markov process model is presented based on some notations of mixed vector–scalar operations. Then, several steady-state system properties are deduced from this model. These include the reversibility and duality of transfer lines, conservation of flow, and the flow rate–idle time relationship. Finally, a four-stage transfer line case is used to compare and evaluate the accuracy of some approximation methods presented in the literature with the exact numerical solutions this model can provide. The properties and their proofs in this paper lay the theoretic foundation for some widely held assumptions in decomposition techniques of long transfer lines in the area of manufacturing systems engineering.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Adaptive policy of buffer allocation and preventive maintenance actions in unreliable production lines

The buffer allocation problem is an NP-hard combinatorial optimization problem, and it is an important design problem in manufacturing systems. The research proposed in this paper concerns a product line consisting of n unreliable machines with n − 1 buffers and a preventive maintenance policy. The focus of the research is to obtain a better trade-off between the buffer level ...

متن کامل

Analysis of a Discrete Material Unreliable Merge System with a Finite Intermediate Buffer and Three Stations with Operational -- Dependent and Idleness Failures

This paper examines a model of a flow line consisting of three unreliable machines and one buffer of limited capacity. The main assumptions of the model are the non linearity of the flow of material with the system performing merge operations and the new way of the machines reaching failure by allowing the machines to fail not only when they are operational but also when are either blocked or s...

متن کامل

Finite Horizon Economic Lot and Delivery Scheduling Problem: Flexible Flow Lines with Unrelated Parallel Machines and Sequence Dependent Setups

This paper considers the economic lot and delivery scheduling problem in a two-echelon supply chains, where a single supplier produces multiple components on a flexible flow line (FFL) and delivers them directly to an assembly facility (AF). The objective is to determine a cyclic schedule that minimizes the sum of transportation, setup and inventory holding costs per unit time without shortage....

متن کامل

Simulation Results on Buffer Allocation in a Continuous Flow Transfer Line with Three Unreliable Machines

Engineers designing a continuous flow production line consisting of machines and buffers in series, have to determine the optimal sizes of the intermediate buffers. When the machines operating on the product are unreliable, this dimensioning decision becomes even more difficult. This paper aims to provide some insight into the optimal sizes of intermediate buffers in a continuous flow transfer ...

متن کامل

STAGE-DISCHARGE MODELING USING SUPPORT VECTOR MACHINES

Establishment of rating curves are often required by the hydrologists for flow estimates in the streams, rivers etc. Measurement of discharge in a river is a time-consuming, expensive, and difficult process and the conventional approach of regression analysis of stage-discharge relation does not provide encouraging results especially during the floods. P

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • Annals OR

دوره 93  شماره 

صفحات  -

تاریخ انتشار 1983