Optimization-based manufacturing scheduling with multiple resources, setup requirements, and transfer lots
نویسندگان
چکیده
DONG CHEN1, PETER B. LUH2, LAKSHMAN S. THAKUR3 and JACK MORENO JR.4 1Aristeia Capital L.L.C., 381 Fifth Avenue, 6th Floor, New York, NY 10016, USA E-mail: dong [email protected] 2Department of Electrical and Computer Engineering, and 3School of Business Administration, University of Connecticut, Storrs, CT 06269, USA E-mail: [email protected] or [email protected] 4J. M. Products Inc., Southbury, CT 06488, USA
منابع مشابه
Meta heuristic for Minimizing Makespan in a Flow-line Manufacturing Cell with Sequence Dependent Family Setup Times
This paper presents a new mathematical model for the problem of scheduling part families and jobs within each part family in a flow line manufacturing cell where the setup times for each family are sequence dependent and it is desired to minimize the maximum completion time of the last job on the last machine (makespan) while processing parts (jobs) in each family together. Gaining an optimal s...
متن کاملReliability Based Maintenance and Human Resources Work-Rest Scheduling in Manufacturing System
In today's competitive market, all manufacturers attempt to improve their maintenance policy in order to decrease the cost of failure and increase the quality of products, but most of these attempts do not consider the role of humans involved in a manufacturing system. Human resources are the main factor in manufacturing that has an undeniable effect on products quality, machines reliability, s...
متن کاملBi-level Model for Reliability based Maintenance and Job Scheduling
Many defects in manufacturing system are caused by human resources that show the significance of the human resources in manufacturing systems. Most manufacturers attempt to investigate the human resources in order to improve the work conditions and reduce the human error by providing a proper work-rest schedule. On the other hand, manufacturer deal with machine scheduling based on demand and wo...
متن کاملVirtual manufacturing cells scheduling considering lotstreaming and sequence dependent setup times
In this paper, a new mathematical model for the problem of job scheduling in virtual manufacturing cells (VMC) is presented to minimizing the completion time of all jobs. Sequence dependent setup times of machines is considered and lot-streaming is possible. In Virtual manufacturing cells, each job has a different processing path and there is a set of machines for processing each operation. The...
متن کاملA Multi-objective optimization model for project scheduling with time-varying resource requirements and capacities
Proper and realistic scheduling is an important factor of success for every project. In reality, project scheduling often involves several objectives that must be realized simultaneously, and faces numerous uncertainties that may undermine the integrity of the devised schedule. Thus, the manner of dealing with such uncertainties is of particular importance for effective planning. A realistic sc...
متن کامل