Minimizing Risk Costs through Optimal Responses in NPD Projects

نویسندگان

  • Chan-Sik Kim
  • Jong-Seong Kim
چکیده

In rapidly changing market environment, firms are investing a lot of time and resources into new product development (NPD) projects to make profit and to obtain competitive advantage. However, failure rate of NPD projects is becoming high due to various internal and external risks which hinder successful NPD projects. To reduce the failure rate, it is critical that risks have to be managed effectively and efficiently through good strategy, and treated by optimal responses to minimize risk cost. Four strategies are adopted to handle the risks in this study. The optimal responses are characterized by high reduction of risk costs with high efficiency. This study suggests a framework to decide the optimal responses considering the core risks, risk costs, response efficiency and response costs for successful NPD projects. Both binary particles warm optimization (BPSO) and multi-objective particle swarm optimization (MOPSO) methods are mainly used in the framework. Although several limitations exist in use for real industries, the frame work shows good strength for handling the risks with highly scientific ways through an example. Keywords—NPD projects, risk cost, strategy, optimal responses, Particle Swarm Optimization.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

An optimal model for Project Risk Response Portfolio Selection (P2RPS) (Case study: Research institute of petroleum industry)

In the real world, risk and uncertainty are two natural properties in the implementation of Mega projects. Most projects fail to achieve the pre-determined objectives due to uncertainty. A linear integer programming optimization model was used in this work to solve a problem in order to choose the most appropriate risk responses for the project risks. A mathematical model, in which work structu...

متن کامل

A New Approach to Project Risk Responses Selection with Inter-dependent Risks

Risks are natural and inherent characteristics of major projects. Risks are usually considered independently in analysis of risk responses. However, most risks are dependent on each other and dependent risks are rare in the real world. This paper proposes a model for proper risk response selection from the responses portfolio with the purpose of optimization of defined criteria for projects. Th...

متن کامل

A MATHEMATICAL MODEL FOR SELECTING THE PROJECT RISK RESPONSES IN CONSTRUCTION PROJECTS

Risks are natural and inherent characteristics of major projects. Risks are usually considered independently in analysis of risk responses. However, most risks are dependent on each other and independent risks are rare in the real world. This paper proposes a model for proper risk response selection from the responses portfolio with the purpose of optimization of defined criteria for projects. ...

متن کامل

Determining Optimal Risk Assessment Model in Construction Projects (Case study: steel plant construction project)

Introduction: Identifying occupational hazards and managing occupational safety and health risks is the most important mission and responsibility of the health and safety management system in organizations and adopting coded plans to achieve this is the key to continuously improving this system and promoting it. Method: This descriptive-analytic research has been written to determine the optim...

متن کامل

A Multi-Criteria Decision-Making Approach with Interval Numbers for Evaluating Project Risk Responses

The risk response development is one of the main phases in the project risk management that has major impacts on a large-scale project’s success. Since projects are unique, and risks are dynamic through the life of the projects, it is necessary to formulate responses of the important risks. Conventional approaches tend to be less effective in dealing with the imprecise of the risk response deve...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2013