Formalizing Construction Sequencing Constraints for Rapid Generation of Schedule Alternatives

نویسندگان

  • Martin Fischer
  • Bonsang Koo
چکیده

Construction planners today use CPM-based schedules to represent the planned logical sequence of activities to perform a project. A construction schedule typically represents the sequence of multiple trades that perform individual work while sharing common workspaces or resources. The logic or “rationale” behind activity sequences of these schedules can include physical relationships between components (e.g., supported by), trade interactions (e.g., workspace competition) or safety and code regulations (e.g., testing). Due to changing project demands, planners frequently need to modify activity sequences during the course of a project. More than one alternative can exist, and hence planners need to develop and evaluate alternative sequences correctly and rapidly to make well-informed decisions. When developing sequencing alternatives, planners need to understand the physical or technical “role” an activity plays on following activities. They also need to distinguish between activities that may or may not be delayed. Planners infer the role and “status” (i.e., whether an activity may be delayed) of activities based on the initial rationale and flexibility of the constraints between activities. However, the current CPM framework only distinguishes the temporal aspects of constraints (e.g., FS precedence relationship) and only distinguishes the time-criticality of activities. Consequently, determining the role and status of activities can only be performed in the planner’s minds. Hence, identifying and developing sequencing alternatives using CPM-based schedules is today an error-prone and time-consuming process. In this paper, we introduce research to determine how sequencing constraints can be represented to enable planners to describe rationale accurately. We also introduce an activity classification mechanism that can be used by a computer system to automatically determine the role and status of activities. We describe a formalized process that utilizes the representation and classification mechanism to assist planners in developing sequencing alternatives correctly and accurately. Finally, we discuss the necessary research to validate the generality and power of the proposed approach more fully.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

CIFECENTER FOR INTEGRATED FACILITY ENGINEERING A Formal Identification and Re-sequencing Process for Rapid Generation of Sequencing Alternatives in CPM Schedules

Construction planners face many scheduling challenges during the course of a project. Limitations in time and resources frequently require planners to re-sequence existing activity sequences to expedite milestone or bottleneck activities. Re-sequencing activities within a CPM network, however, is time-consuming and error-prone because planners find it difficult to know which activities may be d...

متن کامل

A New Approach for Resource-Constrained Multi-project Scheduling

Construction and facilities maintenance projects involve a large number of people and tasks with resource constraints and precedence constraints. This paper presents a new approach to model this problem as a resource-constrained multi-project scheduling problem (RCMPSP) with cost minimization. The scheduling problem is first decomposed into two sub-problems: schedule generation and sequencing. ...

متن کامل

Construction of Various γ34.5 Deleted Fluorescent-Expressing Oncolytic herpes Simplex type 1 (oHSV) for Generation and Isolation of HSV-Based Vectors

Background: Oncolytic herpes simplex virus (oHSV)-based vectors lacking γ34.5 gene, are considered as ideal templates to construct efficient vectors for (targeted) cancer gene therapy. Herein, we reported the construction of three single/dually-flourescence labeled and γ34.5-deleted, recombinant HSV-1 vectors for rapid generation and easy selection/isolation of different HSV-Based v...

متن کامل

CIFECENTER FOR INTEGRATED FACILITY ENGINEERING Formalization of Construction Sequencing Rationale & Classification Mechanism to Support Rapid Generation of Sequencing Alternatives

The ability to re-sequence activities is a critical task for project planners for effective project control. Re-sequencing activities requires planners to determine the impact or “role” an activity has on following activities. They also need to determine which activities may or may not be delayed. Distinguishing the role and “status” (i.e., whether an activity may be delayed) of activities in t...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2003