Determination of optimal cut-off grade policy to optimize NPV using a new approach with optimization factor

نویسنده

  • A. Nieto
چکیده

One of the most difficult problems in mining operation is how to determine optimum cut-off grades of ores at different periods over the lifespan of the mine that will maximize the net present value (NPV) of the mine. Maximizing the NPV of a mining operation, subject to different constraints is a nonlinear programming problem. Cut-off grade optimization is used to arrive at an operating strategy that maximizes the value of a mine. Cut-off optimization as a concept has been known for many years, particularly since Lane’s latest revolution, but it is still not widely practised. Cut-off grade optimization maximizes the NPV of a project subject to capacity constraints in the mine, mill and the market. These are usually expressed as annual limits to the tonnage mined, tonnage milled and product sold. At any point in time at least one limit, and possibly two or all three, will be constraining the system. For cut-off optimization to work correctly, capacity constraints must be independent of the cut-off grade. The cut-off grade is used to distinguish ore from waste materials. If the cut-off grade is too high, much of the mined material will go to the waste dump area. If the cut-off is too low, then the input capacity of the entire mining and mineral processing operations will be fully stretched, while revenues do not necessarily increase. The optimal strategy is one that strikes the correct balance between these two limits. This paper describes the determination of a cut-off grade strategy based on Lane’s (Lane, 1964), algorithm adding an optimization factor based on the generalized reduced gradient (GRG) algorithm to maximize the project’s NPV. In this study, a computer program using Excel and Visual Basic has been developed to implement the algorithm. An interactive userfriendly cut-off grade program was coded using Visual Basic in a Wwindows based spreadsheet application (Excel), a well-known application commonly used by mining professionals. The cut-off grade program developed is used to incorporate the optimization factor (σ) which is included in the ultimate cut-off grade equation, which considers the mining (m) cost,

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

The effect of price changes on optimum cut-off grade of different open-pit mines

Maximizing economic earnings is the most common goal in cut-off grade optimization of open-pit mining operations. When this is the case, the price of the product has a critical effect on optimum value of cut-off grade. This paper investigates the relationship between optimum cut-off grade and price to maximize total cash flow and net percent value (NPV) of operation. In order to visualize this ...

متن کامل

Comparison of golden section search method and imperialist competitive algorithm for optimization cut-off grade- case study: Mine No. 1 of Golgohar

Optimization of the exploitation operation is one of the most important issues facing the mining engineers. Since several technical and economic parameters depend on the cut-off grade, optimization of this parameter is of particular importance. The aim of this optimization is to maximize the net present value (NPV). Since the objective function of this problem is non-linear, three methods can b...

متن کامل

Choosing the Optimum Underground Mine Layout with Regard to Metal Price Uncertainty Using Expected Utility Theory

Metal price is one of the most important parameters in the calculation of cut- off grade. The cut- off grade has the main role in determination of mine layout. Mine layout actuates mineable reserve, mine life and economic profitability. Not considering the uncertainty in metal prices can lead to a non-optimal layout. In this paper optimum underground mine layout is determined by expected utilit...

متن کامل

Cut-off Grade Optimization for Maximizing the Output Rate

In the open-pit mining, one of the first decisions that must be made in production planning stage, after completing the design of final pit limits, is determining of the processing plant cut-off grade. Since this grade has an essential effect on operations, choosing the optimum cut-off grade is of considerable importance. Different goals may be used for determining optimum cut-off grade. One of...

متن کامل

Multi-objective optimization in WEDM of D3 tool steel using integrated approach of Taguchi method & Grey relational analysis

In this paper, wire electrical discharge machining of D3 tool steel is studied. Influence of pulse-on time, pulse-off time, peak current and wire speed are investigated for MRR, dimensional deviation, gap current and machining time, during intricate machining of D3 tool steel. Taguchi method is used for single characteristics optimization and to optimize all four process parameters simultaneous...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2007