This paper focuses on a hub reentrant shop scheduling problem which is motivated by actual packing production line in the iron and steel industry. There are five operations for processing a job where three operations must be processed on a hub machine, and between any two consecutive operations on the hub machine, two operations must be processed on other two secondary machines, respectively. We mainly consider two types of the problem. The first is basic hub reentrant shop (BHRS) problem where only one machine in each secondary machine center. The second is hybrid hub reentrant shop (HHRS) problem where multiple machines in each secondary machine center. The objective is to minimize the makespan. For BHRS problem, we show that the problem is NP-hard in the strong sense. Some properties are derived for identifying an optimal schedule. Furthermore, a heuristic algorithm is proposed with the worst performance ratio 6:5, and this ratio is demonstrated tight. For HHRS problem, two wellsolvable cases are proposed, respectively. Under a split condition, HHRS is equivalent to a two-stage hybrid flow shop problem. The worst case of a class of proposed algorithms is analyzed. The performance ratio is demonstrated relatively with the secondary machine numbers.
منابع مشابه
A Cellular Learning Automata (CLA) Approach to Job Shop Scheduling Problem
Job shop scheduling problem (JSSP), as one of the NP-Hard combinatorial optimization problems, has attracted the attention of many researchers during the last four decades. The overall purpose regarding this problem is to minimize maximum completion time of jobs, known as makespan. This paper addresses an approach to evolving Cellular Learning Automata (CLA) in order to enable it to solve the J...
متن کاملOptimal Scheduling Of Two-Stage Reentrant Hybrid Flow Shop For Heat Treatment Process
The reentrant hybrid flow shop for a heat treatment process is considered in this study. We consider job scheduling in a reentrant hybrid flow shop problem that consists of two statges in series. The first stage is washing, followed by heat treating in the second stage. Each job passes through the first and second stages, respectively, and then re-enter the first stage one more time. Since the ...
متن کاملSolving Re-entrant No-wait Flow Shop Scheduling Problem
In this study, we consider the production environment of no-wait reentrant flow shop with the objective of minimizing makespan of the jobs. In a reentrant flow shop, at least one job should visit at least one of the machines more than once. In a no-wait flowshop scheduling problem, when the process of a specific job begins on the first machine, it should constantly be processed without waiting ...
متن کاملMaximizing service level in a β-robust job shop scheduling model
In the realm of scheduling problems, different sources of uncertainty such as probabilistic durations of jobs or stochastic breakdowns of machines can arise. Given this, one highly desirable characteristic of an intelligent schedule is to bring better punctuality with less efficiency-loss because a dominant factor in customer appreciation is punctuality. It is also one of the most intangible to...
متن کاملMinimizing Makespan in a Class of Reentrant Shops
We study the problem of scheduling a chain-reentrant shop, a shop in which each job goes for its processing rst to a machine called the primary machine, then to a number of other machines in a xed sequence, and nally back to the primary machine for its last operation. The problem is to schedule the jobs so as to minimize the makespan. This problem is NP-hard in the strong sense for a general nu...