In a shop floor of the industry, the routings which are based upon the jobs that need to be processed on different machines are one among the major activities and therefore the resource requirements are not based upon the quantity as in a flow shop but rather the routings for the products being produced. However, both job shop and flow shop production cope with a scheduling problem to find a feasible sequence of jobs on given machines with the objective of minimising some function of the job completion times. Job completion time (make-span) can be defined as the time span from material availability at the first processing operation to the completion at the last operation [1]. Johnson [2] has shown that, in a 2-machines flow shop, an optimal sequence can be constructed. It was demonstrated later that -machine flow shop scheduling problem (FSSP) is strongly NP-hard for 3 [3]. FSSPs can be divided into two main categories: dynamic and static. The dynamic flow shop considered is one where jobs arrive continuously over time. The static flow shop-sequencing and scheduling problem denotes the problem of determining the best sequence of jobs on each machine in the flow shop. The criterion of optimality in a flow shop sequencing problem is usually specified as minimization of make-span that is defined as the total time to ensure that all jobs are completed on all machines. If there are no release times for the jobs then the total completion time equals the total flow time. In some cases for calculating the completion times specific constraints are assumed. For example, such a situation in the FSSP arises when no idle time is allowed at machines. This constraint creates an important practical situation that arises when expensive machinery is employed [4]. The general scheduling problem for a classical shop
منابع مشابه
A Hybrid Genetic Algorithm for the Open Shop Scheduling with Makespan and Total Completion Time
Proper scheduling of tasks leads to optimum using of time and resources, in order to obtaining best result. One of the most important and complicated scheduling problems is open shop scheduling problem. There are n jobs in open shop scheduling problem which should be processed by m machines. Purpose of scheduling open shop problem is attaining to a suitable order of processing jobs by specified...
متن کاملA Hybrid Genetic Algorithm for the Open Shop Scheduling with Makespan and Total Completion Time
Proper scheduling of tasks leads to optimum using of time and resources, in order to obtaining best result. One of the most important and complicated scheduling problems is open shop scheduling problem. There are n jobs in open shop scheduling problem which should be processed by m machines. Purpose of scheduling open shop problem is attaining to a suitable order of processing jobs by specified...
متن کاملOptimal Two Stages Specially Structured Flow Shop Scheduling: Minimize the Rental Cost with Independent Setup Time
One of the earliest results in flow shop scheduling theory is an algorithm given by Johnson’s [1] for scheduling jobs on two or three machines to minimize the total elapsed time whenever the processing times of jobs are random. The present paper is an attempt to develop a heuristic algorithm for two stages specially structured flow shop scheduling in which the processing times of the jobs a...
متن کاملA novel hybrid genetic algorithm to solve the make-to-order sequence-dependent flow-shop scheduling problem
Flow-shop scheduling problem (FSP) deals with the scheduling of a set of n jobs that visit a set of m machines in the same order. As the FSP is NP-hard, there is no efficient algorithm to reach the optimal solution of the problem. To minimize the holding, delay and setup costs of large permutation flow-shop scheduling problems with sequence-dependent setup times on each machine, this pap...
متن کاملHeuristic approach to solve hybrid flow shop scheduling problem with unrelated parallel machines
In hybrid flow shop scheduling problem (HFS) with unrelated parallel machines, a set of n jobs are processed on k machines. A mixed integer linear programming (MILP) model for the HFS scheduling problems with unrelated parallel machines has been proposed to minimize the maximum completion time (makespan). Since the problem is shown to be NP-complete, it is necessary to use heuristic methods to ...
متن کاملBi-objective Optimization for Just in Time Scheduling: Application to the Two-Stage Assembly Flow Shop Problem
This paper considers a two-stage assembly flow shop problem (TAFSP) where m machines are in the first stage and an assembly machine is in the second stage. The objective is to minimize a weighted sum of earliness and tardiness time for n available jobs. JIT seeks to identify and eliminate waste components including over production, waiting time, transportation, inventory, movement and defective...