Single Machine Scheduling with Distinct Due Dates under Fuzzy Environment
نویسنده
چکیده
Single machine, distinct due dates, early/lately machine problem and fuzzy environment closely models the situation faced by ‘Just In Time’ manufacturing. The objective of this paper is to sequence the jobs on the machine, so that the total penalty cost be minimum. This cost is composed of the total earliness and the total tardiness cost. An algorithm is developed here to minimize the total penalty cost due to earliness or lateness of jobs in fuzzy environment. Result shows that the developed heuristic algorithm performs well with small system.
منابع مشابه
A Possibility Linear Programming Approach to Solve a Fuzzy Single Machine Scheduling Problem
This paper employs an interactive possibility linear programming approach to solve a single machine scheduling problem with imprecise processing times, due dates, as well as earliness and tardiness penalties of jobs. The proposed approach is based on a strategy of minimizing the most possible value of the imprecise total costs, maximizing the possibility of obtaining a lower total costs, and mi...
متن کاملSINGLE MACHINE DUE DATE ASSIGNMENT SCHEDULING PROBLEM WITH PRECEDENCE CONSTRAINTS AND CONTROLLABLE PROCESSING TIMES IN FUZZY ENVIRONMENT
In this paper, a due date assignment scheduling problem with precedence constraints and controllable processing times in uncertain environment is investigated, in which the basic processing time of each job is assumed to be the symmetric trapezoidal fuzzy number, and the linear resource consumption function is used.The objective is to minimize the crisp possibilistic mean (or expected) value of...
متن کاملA fuzzy mixed-integer goal programming model for a parallel machine scheduling problem with sequence-dependent setup times and release dates
This paper presents a new mixed-integer goal programming (MIGP) model for a parallel machine scheduling problem with sequence-dependent setup times and release dates. Two objectives are considered in the model to minimize the total weighted flow time and the total weighted tardiness simultaneously. Due to the com-plexity of the above model and uncertainty involved in real-world scheduling probl...
متن کاملSingle Machine Scheduling Problem under Fuzzy Processing Time and Fuzzy Due Dates
In this paper, we propose n-jobs to be processed on Single Machine Scheduling Problem (SMSP) involving fuzzy processing time and fuzzy due dates. The different due dates for each job be considered which meet the demand of customer with more satisfaction level. The main objective of this paper is the total penalty cost to be minimum in the schedule of the jobs on the single machine. This cost is...
متن کاملMinimizing Total Weighted Tardiness with Drop Dead Dates in Single Machine Scheduling Problem
This paper deals with minimization of tardiness in single machine scheduling problem when each job has two different due-dates i.e. ordinary due-date and drop dead date. The drop dead date is the date in which jobs’ weights rise sharply or the customer cancels the order. A linear programming formulation is developed for the problem and since the problem is known to be NP-hard, three heuristic...