Multi-Objective Optimization Issues in Short-Term Batch Scheduling
نویسندگان
چکیده
In this article, we propose a multiple objective optimization based approach for the short term scheduling of batch plants to select superior solutions when compared to the single objective problem. Two alternate approaches to optimality, viz. lexicographic and pareto-optimality based formulations are considered here. We demonstrate the suitability of lexicographic optimization for the case when the importance associated with the objectives is known a priori. Next, we also show the practicality of the pareto-optimization based approach when an explicit precedence ordering of the objectives is not known. Case studies involving the objectives of make-span minimization and profit maximization problem are considered here in the discrete state task network representation of (Kondili et al., 1993), to demonstrate the practicality of the above approaches, towards deciding on operating schedules.
منابع مشابه
A bi-objective model for a scheduling problem of unrelated parallel batch processing machines with fuzzy parameters by two fuzzy multi-objective meta-heuristics
This paper considers a bi-objective model for a scheduling problem of unrelated parallel batch processing machines to minimize the makespan and maximum tardiness, simultaneously. Each job has a specific size and the data corresponding to its ready time, due date and processing time-dependent machine are uncertain and determined by trapezoidal fuzzy numbers. Each machine has a specific capacity,...
متن کاملPro-active Scheduling by a Combined Robust Optimization and Multi-parametric Programming Approach
In this work, we address short-term batch process scheduling under uncertainty in which the scheduling model is contaminated with uncertain data in the objective function, the right-hand side vector and in the constraint matrix, introduced by price, demand, and processing time or conversion rate uncertainty, respectively. We apply a two-stage robust optimization/multi-parametric programming pro...
متن کاملA Continuous-Time Formulation for Scheduling Multi- Stage Multi-product Batch Plants with Non-identical Parallel Units
Multi-stage multi-product batch plants with non-identical parallel units are quite common in the batch chemical industry. Scheduling production in these plants optimally is a complex task that has received limited attention in the literature. In this work, we propose a new continuous time-representation using asynchronous slots and report a mixed integer linear programming (MILP) formulation fo...
متن کاملMulti-objective Solution Approaches for Employee Shift Scheduling Problems in Service Sectors (RESEARCH NOTE)
Today, workforce scheduling programs are being implemented in many production and service centers. These sectors can provide better quality products and/or services to their customers, taking into account employees’ desires and preferences in order to increase sector productivity. In this study, an employee shift scheduling problem in the service sector is discussed. In the problem, the aim is ...
متن کاملMulti-objective routing and scheduling for relief distribution with split delivery in post-disaster response
Following the occurrence of unexpected events and natural disasters, a highly important relief operation is the transferring of relief commodities from the distribution centers (CDs) to shelters. In this paper, a three-level network consisting of depot of vehicles, distribution centers and shelters has been considered for routing and scheduling of relief vehicles through introducing a multi-obj...
متن کامل