Optimization of Design Parameters and Intelligent Back-analysis of High Bench Dump Slope in Open Pit
نویسنده
چکیده
Dump engineering is an important part in production processes of open-pit mining. In order to complete the mine production tasks smoothly, it is necessary to make the most of land possessed by the dump in an economical and reasonable way. In the paper, we use the dump of Qidashan iron mine which belongs to Anshan Iron and Steel Group as an engineering background to achieve the aim of improving the dump capacity. Basic on the limit equilibrium method to analysis on dump slope parameters which must be inversed in the displacement and back analysis, we constructed the Knowledge Base for the inversion of slope mechanical parameters by using orthogonal experiments and numerical simulation, and substituted the in-situ monitoring data after establishing the neural network prediction model. Then we inferred the equivalent mechanical parameters of scattered particles of dump, it can provide a reliable calculation parameters for slope design, thereby maximize the dump capacity and improve the open pit’s economic benefits.
منابع مشابه
Back analysis of inter-ramp slope failure in Teghout copper mine
Slope stability is one of the most important issues in open pit mining design. The main purpose of any open pit mine design is to propose an optimal excavation configuration, considering safety, ore recovery and financial return. An accurate pit slope design which accounts for the mine geology, structural geology, rock mass properties, and hydrogeology models of the mine area, drastically enhan...
متن کاملA new developed model to determine waste dump site selection in open pit mines: An approach to minimize haul road construction cost
Today, during the life of an open pit mine, million tons of materials, including waste and ore, are displacing by truck fleets. In the case of a shallow ore deposit, which is located up to 300 meters to the ground surface, depending on preliminary equipment size and capacity, it will take three to five years to remove overburden and waste rocks to expose the ore body. In that period, the main w...
متن کاملA field investigation of application of digital terrestrial photogrammetry to characterize geometric properties of discontinuities in open-pit slopes
In order to analyze the slope stability in open-pit mines, the structural parameters of rock mass such as persistence and spatial orientation of discontinuities are characterized through field surveys, which involve spending high costs and times as well as posing high risks of rock toppling and rock fall. In the present work, a new application of terrestrial digital photogrammetry is introduced...
متن کاملInvestigation of Bishop’s and Janbu’s Models Capabilities on Slope Stability Problems with Special Consideration to Open-Pit Mining Operations
One of the most effective parameters in economics of open-pit mines is the pit slope angle, so that the slope angle more than the optimum value increases the probability of a large failure in the pit wall and the slope angle less than the optimum value leads to increasing stripping ratio and reducing net present value of mine. Therefore, in this paper, considering the limit equilibrium methods ...
متن کاملApplication of simulated annealing for optimization of blasting costs due to air overpressure constraints in open-pit mines
Estimating the costs of blasting operations is an important parameter in open-pit mining. Blasting and rock fragmentation depend on two groups of variables. The first group consists of mass properties, which are uncontrollable, and the second one is the drill-and-blast design parameters, which can be controlled and optimized. The design parameters include burden, spacing, hole length, hole diam...
متن کامل