A practical method of determining project risk contingency budgets

نویسندگان

  • Denis F. Cioffi
  • Homayoun Khamooshi
چکیده

Given a collection of accepted risks with corresponding impacts and probabilities over the life of a project (or a relevant portion), a method to estimate the total potential impact at a given certainty is presented. Project sponsors and managers can decide their risk tolerance and set aside corresponding contingency funds. This analytic method uses a binomial distribution with a probability equal to the risks’ average probability. At a desired statistical confidence level, the number of risks to consider is determined, and risks are ranked in descending order of either impact or expected value of impact. The ranked risks’ impacts are then summed over the specified number of risks, leading to an appropriate contingency budget. The budget found with this method compares extremely well with one ascertained from numerical simulations of the risk occurrences.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Development of a Generic Risk Matrix to Manage Project Risks

A generic risk matrix is presented for use identifying and assessing project risks quickly and cost effectively. It assists project managers with few resources to perform project risk analysis. The generic risk matrix (GRM) contains a broad set of risks that are categorized and ranked according to their potential impact and probability of occurrence. The matrix assists PMs in quickly identifyin...

متن کامل

Estimating Project Cost Contingency – Beyond the 10% syndrome

Projects require budgets to set the sponsor’s financial commitment and provide the basis for cost control and measurement of cost performance. A key component of a project budget is cost contingency. This paper reviews the traditional approach of estimating project cost contingency by means of a percentage addition to the base estimate and analyses its many conceptual flaws. Over the past decad...

متن کامل

An Integrative Contingency Model of Software Project Risk Management

Drawing both from the IS literature on software project risk management and the contingency research in Organization Theory literature, the present study develops an integrative contingency model of software project risk management. Adopting a profile deviation perspective of fit, the outcome of a software development project (Performance) is hypothesized to be influenced by the fit between the...

متن کامل

Determining Optimal Risk Assessment Model in Construction Projects (Case study: steel plant construction project)

Introduction: Identifying occupational hazards and managing occupational safety and health risks is the most important mission and responsibility of the health and safety management system in organizations and adopting coded plans to achieve this is the key to continuously improving this system and promoting it. Method: This descriptive-analytic research has been written to determine the optim...

متن کامل

Intuitive and Usable Risk-based Cost Contingency Estimation Model for Generalcontracting Firms

Construction projects inherently possess uncertainties, which represent risks and opportunities to contracting business entities. Their business success, therefore, is largely defined by how these uncertainties are managed from the planning and estimating to execution phases. Traditionally risks, in particular, have been dealt by converting them into the form of a contingency. Ironically, howev...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:
  • JORS

دوره 60  شماره 

صفحات  -

تاریخ انتشار 2009