Planning and Design of Hydraulic Projects

نویسنده

  • S.-H Chen
چکیده

A hydraulic project may be small or large, simple or complex, and single or multiple purposed, and it should provide the functions to accomplish the optimum development of related water and hydropower resources. In many cases, the project will be multi-purposed. For this reason, the investigations may comprise a large number of matters, and some or all of them will influence the selection of the project site and scale. Hence, the entire project must be investigated as a whole before the design requirements for each single structure, such as the dam, can be firmly established. Main aspects of the river development using hydraulic projects, with particular emphasis upon the design requirements for dams and reservoirs, will be presented hereinafter.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Effects of Watershed Management Practices on Some of Flood Characteristics Change in Haftan Watershed

Evaluation of watershed projects is one of the most fundamental problems in countries for future implementation planning and management of natural resources. In regard to lack of required equipment for monitoring and evaluation of watershed projects and investigation of management measures in watersheds, application of hydrologic models is an efficient tool for simulation of watershed behavior ...

متن کامل

Prediction of Vegetation Cover Effect on Bank and Bed Hydraulic Roughness Coefficient in Shiraz Khoshk River

Soil and water resources management of rivers has an important role because of direct relation withdifferent systems such as earth, life, social and people. Although the use of vegetation cover inbioengineering and biological stabilization and also soil and water resources management projects hasmany advantages, but improper methods of design and implementation cause hydraulic specificationsof ...

متن کامل

Assessing the Effective Factors on JudgingArchitectural Design Projects of UniversityStudents

Since nature of architecture is quite different from that of other fields of study, the criteria used forjudging projects in this field continuously undergo some changes. On the other hand, because of the undeniable role ofhuman factors in judging the projects, there is always a percentage of deviation from the standard given the interestsof the judging committee. The standards of judging archi...

متن کامل

A Comparative Study of Automotive NPD’S Performance Indicators between Industry and University Based Projects in a Developing Country.

New product development (NPD) is described in the literature as the transformation of a market opportunity into a product available for sale [ ]. In the automotive industry, within the context of ISO/TS (the automotive quality management system international standard), consists of Three main phases such as planning, Implementation and sales. There are also five sub phases called “Plan...

متن کامل

Designing a buffer-equipped hydraulic engine mount for mid-priced vehicles

A combined hydraulic engine mount and buffer is proposed in this study for use in the mid-priced vehicle. In some vehicle design projects, an engine is selected to use in a new car design. To achieve the desired vibration conditions, the mount can be redesigned with exorbitant costs and long-term research. The idea of using a buffer in the combination of the conventional engine mount is to sugg...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2015