Selection and Determination of Tubing and Production Casing Sizes

ثبت نشده
چکیده

3.1 Overview 3.2 Overview of Nodal Analysis 3.3 Selection and Determination of Tubing and Production Casing Sizes for Flowing Wells Importance of Sensitivity Analysis of Tubing Size Sensitivity Analysis and Optimization of Tubing Size of Flowing Well Optimization Method Based on Surface Tubing Pressure Derived by Given Separator Pressure Optimization Method Based on the Given Wellhead Tubing Pressure pwh Case 1 Solving Process Case 2 Solving Process Case 3 Solving Process Tubing Size Optimization Method of Ensuring Longer Flowing Period Case 4 Solving Process Method of Analyzing Tubing Size Sensitivity Affected by Inflow Performance Case 5 Solving Process Production Casing Size Determination of Flowing Well 3.4 Selection and Determination of Tubing and Production Casing Sizes for Gas Wells Selection and Determination of Tubing Size of Natural Gas Well Selection and Determination Method of Tubing Size with Minimum Energy Consumption of Lifting under Rational Production Rate Case 6 Solving Process Case 7 Solving Process Case 8 Solving Process Method of Selecting and Determining Maximum Tubing Size under Condition of Meeting Carrying Liquid in Gas Well Case 9 Solving Process Selection and Determination Method of Minimum Tubing Size Avoiding Erosion due to Excessive Flow Velocity in Gas Well Case 10 Solving Process Production Casing Size Determination of Natural Gas Well 3.5 Selection and Determination of Tubing and Production Casing Sizes for Artificial Lift Wells Prediction of Daily Liquid Production Rate Level in the High Water Cut Period Artificial Lift Mode Determination Preliminary Selection of Artificial Lift Mode

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Selection of an Active Souring Management Solution for a Gulf of Mexico Waterflood

This paper presents an overview of the factors involved in the selection of an active souring management solution for the Mars field, at which waterflood operations are due to commence in March 2004. It is well documented that the majority of similar seawater injection applications have experienced increased down-hole sulfate-reducing bacteria activity and the reservoir souring and H2S control ...

متن کامل

Burst Strength of Tubing and Casing Based on Twin Shear Unified Strength Theory

The internal pressure strength of tubing and casing often cannot satisfy the design requirements in high pressure, high temperature and high H2S gas wells. Also, the practical safety coefficient of some wells is lower than the design standard according to the current API 5C3 standard, which brings some perplexity to the design. The ISO 10400: 2007 provides the model which can calculate the burs...

متن کامل

Analysis of the Casing Collapse in Terms of Geomechanical Parameters and Solid Mechanics

Casing collapse is one of the major problems in oil fields, imposing a lot of costs on oil companies. This problem occurs not only at drilling times in some formations but also after the completion and production can lead to many problems. Analysis of the behavior of casing collapse in terms of geo-mechanics and solid mechanics could significantly meet the needs of the oil industry of Iran. In ...

متن کامل

Oil well stimulation, usually done with hot solutions of hydrochloric acid, may induce severe corrosion attack on production tubing, downhole tools and casing

Oil well stimulation, usually done with hot solutions of hydrochloric acid, may induce severe corrosion attack on production tubing, downhole tools and casing. Inorganic, organic and combinations of acids along with surfactants are used in a variety of well stimulation treatments. To reduce the aggressive attack of the acid on tubing and casing materials (N80 steel), inhibitors are added to the...

متن کامل

Determination of Blasthole Parameters Based on Field Results (TECHNICAL NOTE).

Correct selection of coefficients for blasthole parameters in Ghalat limestone mine in Shahr-e-kord of Iran has resulted is designing and performing 20 blasting operations. After each blast, fragmented rocks larger than one square meter, called oversize, are estimated and prepared for secondary blasting. Next blasthole pattern were designed based on previous blasting results. The results of the...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2011