An Intelligent Decision Support System for Crane Scheduling in a Container Terminal

نویسنده

  • Guohua WAN
چکیده

In this paper, we studied a crane scheduling problem, i.e., the scheduling of RMCs to minimize the total weighted remaining work for the blocks in a terminal storage yard. The approach is a mix of planning method from AI and optimization methods based on MIP formulation. We implemented a DSS to incorporate both AI techniques and OR models. The experiments in simulation environment showed promising scheduling results with the DSS prototype.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Yard crane scheduling in port container terminals using genetic algorithm

Yard crane is an important resource in container terminals. Efficient utilization of the yard crane significantly improves the productivity and the profitability of the container terminal. This paper presents a mixed integer programming model for the yard crane scheduling problem with non- interference constraint that is NPHARD in nature. In other words, one of the most important constraints in...

متن کامل

Yard Crane Pools and Optimum Layouts for Storage Yards of Container Terminals

As more and more container terminals open up all over the world, competition for business is becoming very intense for container terminal operators. They are finding out that even to keep their existing Sea Line customers, they have to make them happy by offering higher quality service. The quality of service they can provide depends on their operating policies and the design of the terminal la...

متن کامل

A decision support system for quayside operations in a container terminal

a r t i c l e i n f o Keywords: Quayside operations Berth allocation Crane scheduling Container terminal operations This paper proposes a decision support system for optimizing operations on the quayside of a container terminal. Due to the existence of multiple parties involved in the decision making processes within port operations, it is essential to pay attention to each parties' concerns an...

متن کامل

A new approach for constraining failure probability of a critical deteriorating system Yard crane scheduling in port container terminals using genetic algorithm

In this paper, we focus on a continuously deteriorating critical equipment which its failure cannot be measured by cost criterion. For these types of systems like military systems, nuclear systems, etc it is extremely important to avoid failure during the actual operation of the system. In this paper we propose an approach which constrains failure probability to a pre-specified value. This valu...

متن کامل

A Mathematical Model and Grouping Imperialist Competitive Algorithm for Integrated Quay Crane and Yard Truck Scheduling Problem with Non-crossing Constraint

In this research, an integrated approach is presented to simultaneously solve quay crane scheduling and yard truck scheduling problems. A mathematical model was proposed considering the main real-world assumptions such as quay crane non-crossing, precedence constraints and variable berthing times for vessels with the aim of minimizing vessels completion time. Based on the numerical results, thi...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2003