A Stone Resource Assignment Model under the Fuzzy Environment
نویسندگان
چکیده
This paper proposes a bilevel multiobjective optimization model with fuzzy coefficients to tackle a stone resource assignment problem with the aim of decreasing dust and waste water emissions. On the upper level, the local government wants to assign a reasonable exploitation amount to each stone plant so as to minimize total emissions and maximize employment and economic profit. On the lower level, stone plants must reasonably assign stone resources to produce different stone products under the exploitation constraint. To deal with inherent uncertainties, the object functions and constraints are defuzzified using a possibility measure. A fuzzy simulation-based improved simulated annealing algorithm FS-ISA is designed to search for the Pareto optimal solutions. Finally, a case study is presented to demonstrate the practicality and efficiency of the model. Results and a comparison analysis are presented to highlight the performance of the optimization method, which proves to be very efficient compared with other algorithms.
منابع مشابه
SINGLE MACHINE DUE DATE ASSIGNMENT SCHEDULING PROBLEM WITH PRECEDENCE CONSTRAINTS AND CONTROLLABLE PROCESSING TIMES IN FUZZY ENVIRONMENT
In this paper, a due date assignment scheduling problem with precedence constraints and controllable processing times in uncertain environment is investigated, in which the basic processing time of each job is assumed to be the symmetric trapezoidal fuzzy number, and the linear resource consumption function is used.The objective is to minimize the crisp possibilistic mean (or expected) value of...
متن کاملDeveloping a Multi-objective Mathematical Model for Dynamic Cellular Manufacturing Systems
This paper is in search of designing the cellular manufacturing systems (CMSs) under dynamic and flexible environment. CM is proper for small-to-medium lot production environment that helps the companies to produce variable kind of productions with at least scraps. The most important benefits of CM are decline in material handling, reduction in work-in-process, reduction in set-up time, increme...
متن کاملA two Stage Heuristic Solution Approach for Resource Assignment during a Cell Formation Problem
Design of Cellular Manufacturing System involves four major decisions: Cell formation (CF), Group layout (GL), Group scheduling (Gs) and Resource assignment (RA). These problems should be regarded, concurrently, in order to obtain an optimal solution in a CM environment. In this paper a two stage heuristic procedure is proposed for CF and RA decisions problem. The solution approach contains a ...
متن کاملA multi-objective resource-constrained project scheduling problem with time lags and fuzzy activity durations
The resource-constrained project scheduling problem is to find a schedule that minimizes the project duration subject to precedence relations and resource constraints. To further account for economic aspects of the project, one may add an objective of cash nature to the problem. In addition, dynamic nature and variations in real world are known to introduce uncertainties into data. Therefore, t...
متن کاملBenders’ decomposition algorithm to solve bi-level bi-objective scheduling of aircrafts and gate assignment under uncertainty
Management and scheduling of flights and assignment of gates to aircraft play a significant role to improve the performance of the airport, due to the growing number of flights and decreasing the flight times. This research addresses the assignement and scheduling problem of runways and gates simultaneously. Moreover, this research is the first study that considers the constraint of unavailabil...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
دوره شماره
صفحات -
تاریخ انتشار 2014