Uncapacitated lot-sizing problem with production time windows, early production, backlog and lost sale
نویسندگان
چکیده
We consider the single item uncapacitated lot-sizing problem with production time windows, lost sale, early production and backlog over a planning horizon of T periods. In this context, a demand not processed within its time window can either be lost (lost sale), satisfied from a production that is processed before the release period of the demand (early production) or satisfied from a production that occurs after the demand due period (backlog). We present several properties of the optimal solution for different variants of the problem when production time windows are non customer specific. We propose dynamic programming algorithms to solve optimally the examined problems in O(T ).
منابع مشابه
Lot-sizing with production and delivery time windows
We study two different lot-sizing problems with time windows that have been proposed recently. For the case of production time windows, in which each client specific order must be produced within a given time interval, we derive tight extended formulations for both the constant capacity and uncapacitated problems with Wagner-Whitin (non-speculative) costs. For the variant with nonspecific order...
متن کاملThe single-item lot-sizing problem with immediate lost sales
e introduce a profit maximization version of the well-known Wagner-Whitin model for the deterministic uncapacitated single-item lot-sizing problem with lost sales. Demand cannot be backlogged, but it does not have to be satisfied, either. Costs and selling prices are assumed to be time-variant, differentiating our model from previous models with lost sales. Production quantities and levels of l...
متن کاملJOINT ECONOMIC LOT SIZING PROBLEM IN A TWO ECHELON PRODUCTION SYSTEM WITH FINITE PRODUCTION RATE AND LEAD TIME
In this study, a two-echelon supplier-manufacturer system with finite production rate and lead time is proposed. It is assumed that shortage is not permitted and the lot size of manufacturer (second echelon) is m-factors of the lot size of supplier (first echelon) and supplier can supply the manufacturer’s lot size in several shipments in each cyc...
متن کاملA dynamic uncapacitated lot-sizing problem with co-production
We consider an extension of the dynamic uncapacitated lot-sizing problem to account for co-production, where multiple products are produced simultaneously in a single production run. We formulate the problem as a mixed-integer linear programming problem. We then show that a variant of the well-known zero-inventory property holds for this problem, and use this property to extend a dynamic progra...
متن کاملA Polynomial Algorithm for the Multi-Stage Production-Capacitated Lot-Sizing Problem
The multi-stage lot-sizing problem with production capacities (MLSP-PC) deals with a supply chain that consists of a manufacturer with stationary production capacity and intermediaries (distribution centers or wholesalers) and a retailer to face deterministic demand. An optimal supply chain plan for the MLSP-PC specifies when and how many units each organization of the supply chain has to produ...
متن کامل