Chemical industry parks in China are considered high-risk areas because they present numerous risks that can damage the environment, such as pollution incidents. In order to identify the environmental risks and the principal risk factors in these areas, we have developed a simple physical model of a regional environmental risk field (ERF) using existing dispersal patterns and migration models. The regional ERF zoning was also conducted and a reference value for diagnostic methods was developed to determine risk-acceptable, risk-warning, and risk-mitigation zones, which can provide a risk source layout for chemical industry parks. In accordance with the environmental risk control requirements, this study focused on the three stages of control and management of environmental risk and established an environmental risk management system including risk source identification and assessment, environmental safety planning, early risk warning, emergency management, assessment of environmental effects, and environmental remediation of pollution accidents. By using this model, the environmental risks in Tianjin Binhai New Area, the largest chemical industry park in China, were assessed and the environmental risk zoning map was drawn, which suggested the existence of many unacceptable environmental risks in this area. Thus, relevant suggestions have been proposed from the perspective of the adjustment of risk source layout, intensified management of environmental risk control and so on.
منابع مشابه
A Prioritization Model for HSE Risk Assessment Using Combined Failure Mode, Effect Analysis, and Fuzzy Inference System: A Case Study in Iranian Construction Industry
The unavailability of sufficient data and uncertainty in modeling, some techniques, and decision-making processes play a significant role in many engineering and management problems. Attain to sure solutions for a problem under accurate consideration is essential. In this paper, an application of fuzzy inference system for modeling the indeterminacy involved in the problem of HSE risk assessm...
متن کاملRisk Assessment and Hierarchical Risk Management of Enterprises in Chemical Industrial Parks Based on Catastrophe Theory
According to risk systems theory and the characteristics of the chemical industry, an index system was established for risk assessment of enterprises in chemical industrial parks (CIPs) based on the inherent risk of the source, effectiveness of the prevention and control mechanism, and vulnerability of the receptor. A comprehensive risk assessment method based on catastrophe theory was then pro...
متن کاملRisk Assessment of Health Safety and Environmental of Samangan Combined Cycle Power Plant using FMEA&SAW Integrated Model
A power plant can be considered a workplace with a high level of risk.For this reason in order to ensure sustainable Performance in Power Plants risk management is essential. In this study the AHP method for Classification of risks And the FMEA method for risk Rating and SAW method was used to rank the risks. Finally, the ranking was done by FMEA&SAW method.According to the result s of the AHP...
متن کاملUrban green spaces assessment approach to health, safety and environment
The city is alive with dynamic systems, where parks and urban green spaces have high strategic importance which help to improve living conditions. Urban parks are used as visual landscape with so many benefits such as reducing stress, reducing air pollution and producing oxygen, creating opportunities for people to participate in physical activities, optimal environment for children and decreas...
متن کاملDesign and Development of Early Warning System for Desertification and Land Degradation
Early warning systems are key components of strategies to reduce risk. This research, by adopting a systematic approach in the management of the risk of desertification and by including previously developed models and systems, offers an integrated efficient structure in terms of early warning for the risk of desertification as a pilot system for semi-arid areas of west Golestan Province in IRAN...
متن کامل