Due-date performance improvement using TOC's aggregated time buffer method at a wafer fabrication factory
نویسندگان
چکیده
Due-date performance is one of the most important production indexes for success utilized by wafer fabrication factories. Traditionally, the industry sets a specific due-date tightness level and a dispatching rule based on the total processing time, the production capacity, pre-defined order release criteria and historical data, to ensure deliveries are made on-time. However, such policies typically do not solve the due-date performance problem at wafer fabrication factories, since the processes are highly complex. This investigation explores the due-date performance problem using the concept of the aggregated time buffer in critical chain project management (CCPM), which was developed by Dr. Goldratt. A simulation model was constructed and the performance of the proposed method is evaluated based on four dispatching rules at a wafer fabrication factory. The findings reveal that applying aggregated time buffer control system improved the overall due-date control, in terms of on-time delivery rate, average tardiness, and variances in average tardiness and lateness. 2008 Elsevier Ltd. All rights reserved.
منابع مشابه
Estimation of the Cycle Time Distribution of a Wafer Fab by a Simple Simulation Model
Semiconductor manufacturing facilities are very complex. To obtain a fundamental understanding of the effects of dispatch and lot release rules on the factory performance based on a full factory model is difficult. In this paper, we therefore present a simple factory model that is intended to show essentially the same behavior as the complete factory. The model consists of the bottleneck workce...
متن کاملA Collaborative Fuzzy-neural Approach for Internal Due Date Assignment in a Wafer Fabrication Plant
Though many of the previous studies have been devoted to internal due date assignment in a wafer fabrication factory (wafer fab), very few among them considered the allowance added to a completion time forecast. In this way, the probability of on-time delivery is only about 50%. Methods based on confidence intervals generate completion time forecasts with very wide ranges and are not practical....
متن کاملA Centralized Approach to Factory Simulation
This paper describes the goals, practices, and methodologies of the Siemens Semiconductor Division's Factory Modeling and Simulation team. The team's charter is to implement performance modeling capability (simulation, capacity analysis, and cost analysis) at factories throughout the division, both wafer fabrication and back-end operations. Findings of recent modeling activities are discussed, ...
متن کاملThe Influence of Industrial Engineering in Semiconductor Fabrication Factory Optimization
To meet competitive market for the electronics consumer products, the integrated circuit is process at the semiconductor fabrication factory which is the most complex and challenging areas in manufacturing. This is due to semiconductor manufacturers will require to process 300 to 1000 steps depends on products, 60,000 WIP and 400 pieces equipment for typical 200mm wafer size technology. Due to ...
متن کاملEstimating the Job Cycle Time in Wafer Fabrication with Distributed Sensors
Estimating the job cycle time is very important for the control of a factory. However, the uncertainty in the job cycle time is not easy to deal with. In order to effectively estimate the job cycle time in a wafer fabrication factory, a group of distributed sensors are used in this study. In the proposed methodology, each sensor monitors the factory conditions, and uses a fuzzy neural network t...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- Expert Syst. Appl.
دوره 36 شماره
صفحات -
تاریخ انتشار 2009