Should solar photovoltaics be deployed sooner because of long operating life at low, predictable cost?

نویسنده

  • Ken Zweibel
چکیده

Governments subsidize the deployment of solar photovoltaics (PV) because PV is deployed for societal purposes. About seven thousand megawatts were deployed in 2009 and over 10,000 are expected in 2010. Yet this is too slow to strongly affect energy and environmental challenges. Faster societal deployment is slowed because PV is perceived to be too costly. Classic economic evaluations would put PV electricity in the range of 15–50 c/kWh, depending on local sunlight and system size. But PV has an unusual, overlooked value: systems can last for a very long time with almost no operating costs, much like, e.g., the Hoover Dam. This long life is rarely taken into account. The private sector cannot use it because far-future cash flow does not add to asset value. But we should not be evaluating PV by business metrics. Governments already make up the difference in return on investment needed to deploy PV. PV deployment is government infrastructure development or direct purchases. Thus the question is: Does the usually unevaluated aspect of long life at predictably low operating costs further motivate governments to deploy more PV, sooner? & 2010 Elsevier Ltd. All rights reserved. (footnote continued) 20-year assumption which is commonly made today.’’ Modules have been tested and monitored at NREL’s Outdoor Test Facility since the early 1980s and by the Joint Research Council’s European Solar Test Installation (http://re.jrc.ec.europa.eu/esti/activities_projects/module_lifetime_en.htm) since 1982. 3 Mitchell stated: ‘‘ythere is no longer any catastrophic failure mechanism in inverters,’’ implying that lifetime expectations can be extended well beyond those of the recent past. Heacox (2010) stated: ‘‘The financial modeling norm for PV

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Three-dimensional nanopillar-array photovoltaics on low-cost and flexible substrates.

Solar energy represents one of the most abundant and yet least harvested sources of renewable energy. In recent years, tremendous progress has been made in developing photovoltaics that can be potentially mass deployed. Of particular interest to cost-effective solar cells is to use novel device structures and materials processing for enabling acceptable efficiencies. In this regard, here, we re...

متن کامل

National Aeronautics and Space Administration Inorganic Photovoltaics Materials and Devices: Past, Present, and Future

This report describes recent aspects of advanced inorganic materials for photovoltaics or solar cell applications. Specific materials examined will be high-efficiency silicon, gallium arsenide and related materials, and thin-film materials, particularly amorphous silicon and (polycrystalline) copper indium selenide. Some of the advanced concepts discussed include multijunction III-V (and thin-f...

متن کامل

بهبود چگالی جریان و افزایش کارایی سلول خورشیدی پلیمری P3HT:PCBM با استفاده از نانومیله اکسید روی

Hybrid solar cells combine organic and inorganic materials with the aim of utilizing the low cost cell production of organic photovoltaics (OPV) as well as obtaining other advantages, such as tuneable absorption spectra, from the inorganic component. Whilst hybrid solar cells have the potential to achieve high power conversion efficiencies (PCE), currently obtained efficiencies are quite low. T...

متن کامل

Life Cycle Assessment of Organic Photovoltaics

The unlimited abundance of solar resources ensures that photovoltaic technologies have the potential to supply a significant amount of the energy required to fulfill currentand futureenergy demands while reducing greenhousegases emissions. So far, the high cost of photovoltaics compared to other energy sources has limited their use. However, emerging technologies, such as organic photovoltaics ...

متن کامل

Nanomedicine: swarming towards the target.

objective of all system providers, as it is for all power-generation systems. It can be achieved by increasing the system efficiency (that is, reducing the collection area, which is a major cost driver) and by reducing materials, production and installation costs. For example, owing to an impressive materials and production cost reduction in the past few years, the LEC of flat non-concentrating...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2010