Integrated Process Planning and Scheduling with Setup Time Consideration by Ant Colony Optimization

نویسندگان

  • S. Y. Wan
  • T. N. Wong
  • Sicheng Zhang
  • Luping Zhang
چکیده

This paper presents an ant colony optimization (ACO) approach in solving integrated process planning and scheduling (IPPS) with the consideration of setup time. Lots of approaches are proposed to solve the IPPS problem. Most of these approaches ignored the consideration of setup time in order to simplify the problem. This practice may be justifiable for some situations. However, it is not practical for the job involving a lot of sequent-dependent setup time. This paper will also discuss the importance of the consideration of setup time in handling IPPS problem.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Two meta-heuristic algorithms for parallel machines scheduling problem with past-sequence-dependent setup times and effects of deterioration and learning

This paper considers identical parallel machines scheduling problem with past-sequence-dependent setup times, deteriorating jobs and learning effects, in which the actual processing time of a job on each machine is given as a function of the processing times of the jobs already processed and its scheduled position on the corresponding machine. In addition, the setup time of a job on each machin...

متن کامل

A Multi-agent System Architecture for Integrated Process Planning and Scheduling with Meta-heuristics

Manufacturing process planning and production scheduling functions are usually performed sequentially, disregarding the dynamic nature of manufacturing system. Integrated process planning and scheduling (IPPS) is to combine both the process planning and scheduling problems in the consideration, with the aim to improve the flexibility and adaptability of the actual process plan and the schedule ...

متن کامل

A Hierarchical Production Planning and Finite Scheduling Framework for Part Families in Flexible Job-shop (with a case study)

Tendency to optimization in last decades has resulted in creating multi-product manufacturing systems. Production planning in such systems is difficult, because optimal production volume that is calculated must be consistent with limitation of production system. Hence, integration has been proposed to decide about these problems concurrently. Main problem in integration is how we can relate pro...

متن کامل

A two-stage approach based on Ant Colony Optimization Algorithm for Integrated Process Planning and Scheduling

This paper presents a two-stage heuristic using Ant Colony Optimization (ACO) to solve Integrated Process Planning and scheduling (IPPS) problem. The algorithm is incorporated with the objective of obtaining an optimal or near optimal schedule for a number of jobs with multi-operations. A graphical search method is used, where artificial ants are assigned as software agents to search for routin...

متن کامل

Resource leveling scheduling by an ant colony-based model

In project scheduling, many problems can arise when resource fluctuations are beyond acceptable limits. To overcome this, mathematical techniques have been developed for leveling resources. However, these produce a hard and inflexible approach in scheduling projects. The authors propose a simple resource leveling approach that can be used in scheduling projects with multi-mode execution activit...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2011