Effect of Schedule Compression on Project Effort

نویسندگان

  • Ye Yang
  • Zhihao Chen
  • Ricardo Valerdi
  • Barry Boehm
چکیده

Schedule pressure is often faced by project managers and software developers who want to quickly deploy information systems. Typical strategies to compress project time scales might include adding more staff/personnel, investing in development tools, improving hardware, or improving development methods. The tradeoff between cost, schedule, and performance is one of the most important analyses performed during the planning stages of software development projects. In order to adequately compare the effects of these three constraints on the project it is essential to understand their individual influence on the project’s outcome. In this paper, we present an investigation into the effect of schedule compression on software project development effort and cost and show that people are generally optimistic when estimating the amount of schedule compression. This paper is divided into three sections. First, we follow the Ideal Effort Multiplier (IEM) analysis on the SCED cost driver of the COCOMO II model. Second, compare the real schedule compression ratio exhibited by 161 industry projects and the ratio represented by the SCED cost driver. Finally, based on the above analysis, a set of newly proposed SCED driver ratings for COCOMO II are introduced which show an improvement of 6% in the model estimating accuracy.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Effect of Schedule Compression on Project Effort in COCOMO II Model for Highly Compressed Schedule Ratings

This paper presents the effect of ‘schedule compression’ on software project management effort using COCOMO II (Constructive Cost Model II), considering projects which require more than 25 percent of compression in their schedule. At present, COCOMO II provides a cost driver for applying the effect of schedule compression or expansion on project effort. Its maximum allowed compression is 25 per...

متن کامل

A Multi-objective optimization model for project scheduling with time-varying resource requirements and capacities

Proper and realistic scheduling is an important factor of success for every project. In reality, project scheduling often involves several objectives that must be realized simultaneously, and faces numerous uncertainties that may undermine the integrity of the devised schedule. Thus, the manner of dealing with such uncertainties is of particular importance for effective planning. A realistic sc...

متن کامل

Forecasting Final Schedule and Cost of Projects by Using Statistical and Mathematical Method

Earned value management (EVM) has prepared some methods to forecast final costs of projects. These methods were not developed since the start of formation and were gradually completed, of course with one exception that is its authenticity, they are still remained unchanged. At the present time EVM guide does not apply from schedule indices to forecast schedule for completion of project and ...

متن کامل

An Extension of the Earned Value Management to Improve the Accuracy of Schedule Analysis Results

A project is any endeavor involving planned action, for example, developing a new product or constructing a dam. [CE1] Major factors for a project to be successful are applying performance measurement and feedback tool. One such well-known performance measurement tool to control the project execution is earned value management (EVM). EVM uses the fundamental principle that trends in the past ca...

متن کامل

Flexible resource management and its effect on project cost and duration

In practice, most projects result in cost overruns and schedule slippage due to poor resource management. This paper presents an approach that aims at reducing project duration and costs by empowering project managers to assess different scenarios. The proposed approach addresses combinatorial modes for tasks, multi-skilled resources, and multiple calendars for resources. A case study reported ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2007