Capacity Determination Model with Time Constraints and Batch Processing in Semiconductor Wafer Fabrication
نویسندگان
چکیده
Recently, wafer fabrication has become more complicated and lengthened the product queue time. To ensure final product yield, engineers need to set up queue time limits for particular machines during wafer processing; we name it as “time constraints”. Time constraint problems are more serious when the time constraint is short, process is reentrant and batching. Generally, batch processing in wafer fabrication is matching these characteristics. To eradicate difficulties with time constraints and batching process, capacity planning must be addressed. This paper applied GI/G/m queuing theory to develop a capacity determination model for batch processing machines. The batching behavior is considered and taken as a factor to modify the mean and squared coefficient of variation of arrive rate in this model. By this queuing network model, the expected waiting time between machines in production systems can be estimated. Managers can also determine the capacity through the setting of expected rate of over time constraints. Furthermore, a checking table is derived for different utilizations, time constraints, and the probability of expected waiting time over time constraints. The approximate performance measures are compared with discrete-event simulation. The result shows the effectiveness of the proposed model and demonstrates that it is superior to the current planning method.
منابع مشابه
Controlling job arrivals with processing time windows into Batch Processor Buffer
front of the batch processor, where they wait to be processed. The batch processor has a finite capacity Q, and the processing time is independent of the number of jobs loaded into the batch processor. In certain manufacturing systems (including semiconductor wafer fabrication), a processing time window exists from the time the job exits the feeder processor till the time it enters the batch pr...
متن کاملProduction scheduling in a semiconductor wafer fabrication facility producing multiple product types with distinct due dates
This paper focuses on production scheduling in a semiconductor wafer fab producing multiple product types that have different due dates and different process flows. In the wafer fab, wafer lots are processed on serial and batch processing workstations, each of which consists of parallel identical machines. Machines in serial processing workstations process wafer lots one by one, while those in ...
متن کاملA Model for Master Planning in Semiconductor Manufacturing
We present a model for making master planning decisions in semiconductor manufacturing. The problem consists in determining appropriate wafer quantities for certain products, facilities (locations), and periods of time. Different demand types, i.e., confirmed orders or forecasts are considered. The reentrant flow in semiconductor wafer fabrication facilities is taken into account for capacity m...
متن کاملMultiple orders per job batch scheduling with incompatible jobs
The growth in demand for semiconductors has been accompanied by intense competition between semiconductor manufacturers to satisfy customer on-time delivery needs. This paper is motivated by scheduling the wafer fabrication phase of 300-mm semiconductor manufacturing, as it contains both batch processing operations and multiple customer orders being grouped into production jobs. The resulting m...
متن کاملACO-based Multi-objective Scheduling of Identical Parallel Batch Processing Machines in Semiconductor Manufacturing
The batch processing machines (BPMs) have the ability to process more than one job together (called a batch). So the scheduling problem of the BPMs concerns not only the priorities of the jobs obtaining the processing service of a BPM, but the number of the jobs processed together on them. According to diverse classified criteria (such as the number of the BPMs and the job families), the schedu...
متن کامل