Identify and prioritize the factors influencing project risk by using AHP & VIKOR Fuzzy (Case Study: South Pars Gas Complex)

نویسندگان

  • Masoud Zolghadri
  • Behnam Vahdani
چکیده

Risk Management is one of The Basic and Important is one of The Basic and Important Subjects of The Project. So in This Research, First The Risk of South Pars Gas Complex In Iran Will Be Recognized. Then The Wight of Every One of These Standards is ranked in The Method of FAHP and Finally the Ranking of Suggested Options of Research Will Be Considered with the Method of VIKOR. The main criteria for this study include: Financial factors, Factors related to the employer, Management factors and Factors relating to the contract. For each of these criteria Measures intended to As Selected 32 Sub criteria in sum. The results indicate that Fiscal agent with normal weight 0.349, Have The highest priority. Also The best choice As a means of reducing risk, Method of SHA&SSHA, is selected as the preferred option.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A New Fuzzy AHP- Fuzzy VIKOR Approach in Control and Management of The Angiography Procedure to Prevent Disruptions: A Case Study

Background and objectives - A hybrid MCDM approach is presented to evaluate and prioritize the disruptions in the angiography process, in a fuzzy environment. The proposed approach is applied to a real case in a public hospital.Methods – In this study, a new approach is utilized based on fuzzy MCDM methods. The disruptions are identified using the experts' opinions. The...

متن کامل

Assessing Human Risk Factors in Oil and Gas Projects: Case of Pars Oil and Gas Company

The purpose of this study is to provide a comprehensive framework for analyzing risk factors in oil and gas projects. The proposed approach in this study consists of several parts: In the first part, 19 common potential risks in the projects of the Pars Oil and Gas Company were finalized by using Lavasheh Validation method in six groups; these factors were identified through review of previous ...

متن کامل

Assessing Human Risk Factors in Oil and Gas Projects: Case of Pars Oil and Gas Company

The purpose of this study is to provide a comprehensive framework for analyzing risk factors in oil and gas projects. The proposed approach in this study consists of several parts: In the first part, 19 common potential risks in the projects of the Pars Oil and Gas Company were finalized by using Lavasheh Validation method in six groups; these factors were identified through review of previous ...

متن کامل

Identification of Safe Assembly Points in Emergencies in a Gas Refinery of the South Pars Gas Complex Using Fuzzy Logic Model

  INTRODUCTION: Crisis management is of critical importance in the oil and gas industries due to the increasing occurrence of accidents in these areas. One of the most important issues regarding crisis management in such industries is the identification of safety assembly points where employees should gather in emergencies. This study aimed to identify the safe points in a refinery using geo...

متن کامل

Proposing a Strategic Model for Technological Crisis management - A Case Study on South Pars Gas Complex – Assaluyeh-Bushehr-IRAN

Quite a lot of people are employed in gas production and refining industry in IRAN. In case of weakness or lack of having an effective management, the associated companies will impose heavy damage to the country. In this regard, to achieve consistency and safety in IRAN, ascendancy of management in these companies is one of the main and effective attempts. In order to manage the crisis of techn...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2015