Scheduling Policies, Batch Sizes, and Manufacturing Lead Times
نویسندگان
چکیده
In this paper, we examine the impact of scheduling policies on batch sizing decisions in a multi-item production system. We also investigate the joint effect of scheduling policies and batch sizing decisions on production lead times. In particular, we compare the performance of a first come-first-served (FCFS) policy with a group scheduling (GS) policy and study the effect of both on the optimal batch size. We show that a group scheduling policy can lead to significant performance gains, as measured by reduced lead times and higher production rates, relative to the FCFS policy and characterize conditions under which these gains are realized. We also study the impact of the GS policy on other system operating parameters. In particular, we find that using a group scheduling policy eliminates the need for batching, preserves system capacity despite the presence of setups, and accommodates higher product mix variety. These results are shown to be very different from those obtained for the FCFS policy and to have important implications for the management and control of multi-item production facilities. † The author's research is supported by the National Science Foundation under grant No. DMII-9309631.
منابع مشابه
Role of batch size in scheduling optimization of flexible manufacturing system using genetic algorithm
Flexible manufacturing system (FMS) readily addresses the dynamic needs of the customers in terms of variety and quality. At present, there is a need to produce a wide range of quality products in limited time span. On-time delivery of customers’ orders is critical in make-to-order (MTO) manufacturing systems. The completion time of the orders depends on several factors including arrival rate, ...
متن کاملScheduling Manufacturing Systems of Re{entrant Lines
Re{entrant lines are manufacturing systems where parts may return more than once to the same machine, for repeated stages of processing. Examples of such systems are semiconductor manufacturing plants. We consider the problems of scheduling such systems to reduce manufacturing lead times, variations in the manufacturing lead times, or holding costs. We assume a deterministic model, which allows...
متن کاملVirtual manufacturing cells scheduling considering lotstreaming and sequence dependent setup times
In this paper, a new mathematical model for the problem of job scheduling in virtual manufacturing cells (VMC) is presented to minimizing the completion time of all jobs. Sequence dependent setup times of machines is considered and lot-streaming is possible. In Virtual manufacturing cells, each job has a different processing path and there is a set of machines for processing each operation. The...
متن کاملRelationships between Batch Sizes, Sequencing and Lead-times
This paper treats the optimization of production batches by computer simulation in a manufacturing company producing electric and pneumatic actuators. In its introduction part the article deals about a wider context of batch production optimization. Subsequently, the paper presents a procedure for creation of a simulation model in SIMPLE ++ software environment. Based on simulation of a manufac...
متن کاملMeta heuristic for Minimizing Makespan in a Flow-line Manufacturing Cell with Sequence Dependent Family Setup Times
This paper presents a new mathematical model for the problem of scheduling part families and jobs within each part family in a flow line manufacturing cell where the setup times for each family are sequence dependent and it is desired to minimize the maximum completion time of the last job on the last machine (makespan) while processing parts (jobs) in each family together. Gaining an optimal s...
متن کامل