Merchant interconnector projects by generators in the EU: Profitability and allocation of capacity

نویسنده

  • Silvester van Koten
چکیده

When building a cross-border transmission line (a so-called interconnector) as a for-profit (merchant) project, where the regulator has required that capacity allocation be done non-discriminatorily by explicit auction, the identity of the investor can affect the profitability of the interconnector project and, once operational, the resulting allocation of its capacity. Specifically, when the investor is a generator (hereafter the integrated generator) who also can use the interconnector to export its electricity to a distant location, then, once operational, the integrated generator will bid more aggressively in the allocation auctions to increase the auction revenue and thus its profits. As a result, the integrated generator is more likely to win the auction and the capacity is sold for a higher price. This lowers the allocative efficiency of the auction, but it increases the expected ex-ante profitability of the merchant interconnector project. Unaffiliated, independent generators, however, are less likely to win the auction and, in any case, pay a higher price, which dramatically lowers their revenues from exporting electricity over this interconnector. & 2011 Elsevier Ltd. All rights reserved.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Electricity Transmission: An Overview of the Current Debate

Electricity transmission has emerged as critical for successfully liberalising power markets. This paper surveys the issues currently under discussion and provides a framework for the remaining papers in this issue. We conclude that signalling the efficient location of generation investment might require even a competitive LMP system to be complemented with deep connection charges. Although a E...

متن کامل

A New Method for Merchandizing Surplus Allocation

Locational Marginal Pricing (LMP) is a method for energy pricing in deregulated power systems. Loss and congestion cause different prices for energy at load or generation buses. In this pricing method there is a different between payments of customers and revenue of generators which is called Merchandizing Surplus (MS). Independent System Operator (ISO) receives MS and generally renders it to T...

متن کامل

Equitable Risk Allocation in Construction Projects: Fuzzy Bargaining Game Approach

An equitable risk allocation between contracting parties plays a vital role in enhancing the performance of the project. This research presents a new quantitative risk allocation approach by integrating fuzzy logic and bargaining game theory. Owing to the imprecise and uncertain nature of players’ payoffs at different risk allocation strategies, fuzzy logic is implemented to determine the value...

متن کامل

Presenting a New Algorithm for Determining Optimal Replaceable Capacity of Conventional Power Plants by Renewable Power Plants Based on Monte Carlo Method

Given the substitution process of generators using renewable energy sources instead of conventional generators in modern power systems, this paper proposes a Monte Carlo based method to determine an optimal level of this change. At first, LOLE index of the system was calculated without wind power to obtain the reference index. Then, the wind turbine units are replaced with the conventional gene...

متن کامل

Providing a New Approach to Optimize Combined Scale Factor Allocation Insurveying Projects

Nowadays, given the widespread use of global projection systems such as the UTM projection system in surveying projects relying on elliptic referents, finding a suitable composite scale factor for each project to implement construction projects using mapping equipment such as devices Total station is necessary. Unfortunately, today the method of calculating and assigning average composite scale...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2011