The Components of Congestion: Delay from Incidents, Special Events, Lane Closures, Weather, Potential Ramp Metering Gain, and Excess Demand

نویسنده

  • Jaimyoung Kwon
چکیده

A method is presented to divide the total congestion delay in a freeway section into six components: the delay caused by incidents, special events, lane closures, and adverse weather; the potential reduction in delay at bottlenecks that ideal ramp metering can achieve; and the remaining delay, due mainly to excess demand. The fully automated method involves two steps. First, the components of non-recurrent congestion are estimated by statistical regression. Second, the method locates all bottlenecks and estimates the potential reduction in delay that ideal ramp metering can achieve. The method can be applied to any site with minimum calibration. It requires data about traffic volume and speed; the time and location of incidents, special events and lane closures; and adverse weather. Applied to a 45-mile section of I-880 in the San Francisco Bay Area, the method reveals that incidents, special events, rain, potential reduction by ideal ramp metering, and excess demand respectively account for 13.3%, 4.5%, 1.6% 33.2% and 47.4% of the total daily delay. The delay distribution of the various components is different between the AM and PM peak periods and between the two freeway directions. Quantifying the components of congestion at individual freeway sites is essential in developing effective congestion mitigation strategies.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

The Congestion Pie: Delay from Collisions, Potential Ramp Metering Gain, and Excess Demand

A method is presented to divide the measured total congestion in any freeway section into three ‘slices’: (1) the delay that collisions cause; (2) the potential reduction in delay at bottlenecks that ideal ramp metering can achieve; and (3) the remaining delay, due mainly to excess demand, but also to all other causes, including non-collision incidents, lane closures, and weather. The method in...

متن کامل

Freeway congestion, ramp metering, and tolls

California freeway travelers suffer large and variable congestion delay. The delay is due to operational inefficiency, excess demand, and unforseen events. Operational inefficiency reduces speed and may cause queue spillovers that reduce exiting flows. Excess demand creates delay on ramps. Unforseen events such as accidents temporarily reduce capacity. The Cell Transmission Model of a freeway w...

متن کامل

Comparing Methods of Ramp Metering for On-Ramps to Improve the Operational Conditions at Peak Hours

This paper aims to evaluate and compare the effects of different methods of ramp metering on the operational conditions of traffic flow at three levels: the network level (including the freeway and its connected ramps), the entrance ramp, and the upstream segment of the entrance. To achieve this aim, one of the most important urban freeways in the metropolis of Isfahan was selected. The traffic...

متن کامل

Modeling and PARAMICS Based Evaluation of New Local Freeway Ramp-Metering Strategy that Takes Ramp Queues into Account

One of the major criticisms of ramp-metering has been the delay caused on the ramps because of the queues created by ramp control strategies. However, recently, several researchers proposed strategies that explicitly take into account ramp queues when determining metering rates. In this paper, an isolated “feedback” based ramp-metering strategy using modeling is presented. In addition to the re...

متن کامل

Integration of information provision in large-scale traffic simulations

A potential benefit of Advanced Traveler Information Systems (ATIS) is the reduction of unexpected traffic delays. Non-recurrent congestion occurs haphazardly at any moment of the day. It may be a consequence of external changes in the demand for travel (special events, holidays, emergency evacuations, etc.) or in the capacities of the infrastructure (impact of weather conditions, accidents, ro...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2006