Approximation Algorithms for the Two-Machine Flow Shop No-Wait Scheduling with a Non-Availability Interval
نویسندگان
چکیده
We study the two-machine flow shop scheduling problem with no-wait in process, in which one of the machines is not available during a given time interval. The objective is to minimize the makespan. The problem is known to be NP-hard, and in the case of several non-availability intervals is not approximable within a constant factor. We consider all possible scenarios of handling the operation affected by the non-availability interval. For all these scenarios, we present approximation algorithms with a worst-case ratio of 3/2. For the resumable scenario, we give a 4/3-approximation algorithm.
منابع مشابه
Solving Re-entrant No-wait Flow Shop Scheduling Problem
In this study, we consider the production environment of no-wait reentrant flow shop with the objective of minimizing makespan of the jobs. In a reentrant flow shop, at least one job should visit at least one of the machines more than once. In a no-wait flowshop scheduling problem, when the process of a specific job begins on the first machine, it should constantly be processed without waiting ...
متن کاملSolving Group Scheduling Problem in No-wait Flow Shop with Sequence Dependent Setup Times
Different manufacturing enterprises use regularly scheduling algorithms in order to help meeting demands over time and reducing operational costs. Nowadays, for a better useofresources and manufacturingin accordance withcustomer needs and given the level ofcompetitionbetweencompanies, employing asuitablescheduling programhasa double importance. Conventional productionmethods are constantly subs...
متن کاملSolving Group Scheduling Problem in No-wait Flow Shop with Sequence Dependent Setup Times
Different manufacturing enterprises use regularly scheduling algorithms in order to help meeting demands over time and reducing operational costs. Nowadays, for a better useofresources and manufacturingin accordance withcustomer needs and given the level ofcompetitionbetweencompanies, employing asuitablescheduling programhasa double importance. Conventional productionmethods are constantly subs...
متن کاملComparing Mixed-Integer and Constraint Programming for the No-Wait Flow Shop Problem with Due Date Constraints
The impetus for this research was examining a flow shop problem in which tasks were expected to be successively carried out with no time interval (i.e., no wait time) between them. For this reason, they should be completed by specific dates or deadlines. In this regard, the efficiency of the models was evaluated based on makespan. To solve the NP-Hard problem, we developed two mathematical mode...
متن کاملApproximation Schemes for Flow Shop Scheduling Problems with Machine Availabilty Constraints
This paper considers two-machine flow shop scheduling problems with machine availability constraints. When the processing of a job is interrupted by an unavailability period of a machine, we consider both the resumable scenario in which the processing can be resumed when the machine next becomes available, and the semi-resumable scenarios in which some proportion of the processing is repeated b...