On the impact of real-time information on field service scheduling
نویسندگان
چکیده
Mobile phone operators need to plan and schedule field force personnel for maintenance and repair tasks on mobile phone base stations across the country on a daily basis. In this paper, we will introduce the field force scheduling problem with priorities. Motivated by the rising popularity of mobile field force management solutions, we compare online and offline heuristics as well as hybrids to solve the problem. The results help understand the benefits of dynamic scheduling based on realtime position information as compared to traditional daily offline planning.
منابع مشابه
Bi-criteria Three Stage Fuzzy Flowshop Scheduling with Transportation Time and Job Block Criteria
Scheduling is an enduring process where the existence of real time information frequently forces the review and modification of pre-established schedules. The real world is complex and complexity generally arises from uncertainty. From this prospective the concept of fuzziness is introduced in the field of scheduling. The present paper pertains to a bi-criterion in n-jobs, three machines fl...
متن کاملOptimal Scheduling of CHP-based Microgrid Under Real-Time Demand Response Program
Microgrid (MG) is considered as a feasible solution to integrate the distributed energy sources. In this paper, optimal scheduling of a grid-connected MG is investigated considering different power sources as combined heat and power (CHP) units, only power and heat generating units, and battery storage systems. Two different feasible operating regions are considered for the CHP units. In additi...
متن کاملDesigning a Volunteer Geographic Information-based service for rapid earth quake damages estimation
Designing a Volunteer Geographic Information-based service for rapid earth quake damages estimation Introduction The advent of Web 2.0 enables the users to interact and prepare free unlimited real time data. This advantage leads us to exploit Volunteer Geographic Information (VGI) for real time crisis management. Traditional estimation methods for earthquake damages are expensive and tim...
متن کاملPresenting a Multi-Objective Mathematical Model for Time-Cost trade off Problem Considering Time Value of Money and Solve it by MOPSO Algorithm
The time - cost tradeoff problem is one of the most critical issues in the project scheduling field and so far, a lot of research has been done with a variety of quantitative and qualitative approaches on this subject. In this research, we intend to provide a two - objective mathematical model which balances crash and delay for activities. So that it provides the right tools for decision makers...
متن کاملAn Effective Task Scheduling Framework for Cloud Computing using NSGA-II
Cloud computing is a model for convenient on-demand user’s access to changeable and configurable computing resources such as networks, servers, storage, applications, and services with minimal management of resources and service provider interaction. Task scheduling is regarded as a fundamental issue in cloud computing which aims at distributing the load on the different resources of a distribu...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- Decision Support Systems
دوره 53 شماره
صفحات -
تاریخ انتشار 2012