In this report we will describe the muon collider target test beam line which operates off one branch of the AGS switchyard. The muon collider target test facility is designed to allow a prototype muon collider target system to be developed and studied. The beam requirements for the facility are ambitious but feasible. The system is designed to accept bunched beams of intensities up to 1.6x10 24 GeV protons in a single bunch. The target specifications require beam spot sizes on the order of 1 mm, 1 sigma rms at the maximum intensity. We will describe the optics design, the instrumentation, and the shielding design. Results from the commissioning of the beam line will be shown.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

AGS PERFORMANCE AND UPGRADES A Possible Proton Driver for a Muon Collider

After the successfull completion of the AGS Booster and several upgrades of the AGS, a new intensity record of 6:3 10 13 protons per pulse accelerated to 24 GeV was achieved. Futher intensity upgrades are being discussed that could increase the average delivered beam intensity by up to a factor of six. The total beam power then reaches almost 1 M W and the AGS can then be considered as a proton...

متن کامل

Carbon and Mercury Target Systems for Muon Colliders and Neutrino Factories*

A high-power target is required to convert a powerful MW-class proton beam into an intense muon source or neutrino source in support of physics at the intensity frontier. The first phase of a Muon Collider or Neutrino Factory program may use a 6.75-GeV proton driver with beam power of only 1 MW. At this lower power it is favorable to use a graphite target with beam and target tilted slightly to...

متن کامل

A 15-t Pulsed Solenoid for a High-power Target Experiment

The MERIT experiment, which ran at CERN in 2007, is a proof-of-principle test for a target system that converts a 4-MW proton beam into a high-intensity muon beam for either a neutrino factory complex or a muon collider. The target system is based on a free mercury jet that intercepts an intense proton beam inside a 15-T solenoidal magnetic field. Here, we describe the design and performance of...

متن کامل

A Proof-of-principle Experiment for a High-power Target System

The MERIT experiment, to be run at CERN in 2007, is a proof-of-principle test for a target system that converts a 4-MW proton beam into a high-intensity muon beam for either a neutrino factory complex or a muon collider. The target system is based on a free mercury jet that intercepts an intense proton beam inside a 15-T solenoidal magnetic field.

متن کامل

A 4-mw Target Station for a Muon Collider or Neutrino Factory

We outline a program of engineering design and simulation for a target station and pion production/capture system for a 4-MW proton beam at the front end of a Muon Collider or a Neutrino Factory. The target system consists of a free liquid-metal (nominally mercury) jet immersed in a high-field solenoid magnet capture system that also incorporates the proton beam dump. Topics to be studied inclu...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2001