Alternative for Quantifying Field-Overhead Damages

نویسندگان

  • William Ibbs
  • Long D. Nguyen
چکیده

The context of delays significantly affects delay responsibility. Among other things, recoverable damages for a delay should be related to the timing of the corresponding delay and its effect on indirect costs. This paper presents an alternative and integrated approach for quantifying and apportioning delay responsibility. It considers the context of a delay in terms of its timing and the degree of suspension during the course of a project. The proposed approach allocates project-site overhead costs onto schedule activities. It then helps track site overhead damages in a “real-time” manner while schedule-window analysis is employed to analyze the delay. A case study is used to illustrate its application. Results infer that the conventional daily overhead rate-based method can cause double payments because conventional recovery possibly covers parts of field overhead already paid from the original contract. This new approach also enables the application of the comparative negligence doctrine when concurrent delays occur by fairly sharing delay damages between the project parties. Practitioners can employ the proposed approach for reasonably quantifying and apportioning delay damages while researchers may further explore its applications in the industry. DOI: 10.1061/ ASCE 0733-9364 2007 133:10 736 CE Database subject headings: Claims; Delay time; Cost analysis; Damage; Scheduling.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Application of Independent Joint Control Strategy for Discrete-Time Servo Control of Overhead Cranes

In this study, a new servo control system is presented for the overhead crane based on discrete-time state feedback approach. It provides both robust tracking and load swing suppression. Inspired from independent joint and computed torque control in robot manipulator field, a new model is derived in which the crane actuators are considered as the main plant. The crane nonlinearities are then tr...

متن کامل

Managing Environmentally Conscious in Designing Closed-loop Supply Chain for the Paper Industry

High amounts of waste paper are disposed of every year in Iran posing the health hazard and environmental damages instead of being recovered. Collection, recovery and proper disposal of waste paper without damaging the environment need to design an efficient closed-loop supply chain network. The main objective of this paper is introducing a bi-objective, multi-echelon, multi-product and single-...

متن کامل

Use of Rod Compactors for High Voltage Overhead Power Lines Magnetic Field Mitigation

In the last decades, strengthening the high voltage transmission system through the installation of new overhead power lines has become critical, especially in highly developed areas. Present laws concerning the human exposure to electric and magnetic fields introduce constraints to be considered in both new line construction and existing systems. In the paper, a technique for passive magnetic ...

متن کامل

Evaluating Seismic Effects on a Water Supply Network and Quantifying Post-Earthquake Recovery

This paper summarises the impact of major earthquakes, 2010–2011, on Christchurch’s water supply network and what recovery measures have been applied, what worked well, what did not and why. A number of issues related to the open nature of the Christchurch water supply network were identified during earthquakes. It was difficult to manage large water supply pressure zones during the post-earthq...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2007