An integrated heuristic for best effort scheduling of (m,k)-firm streams in point-to-point networks

نویسندگان

  • Aaron Striegel
  • Casey Reynolds
  • G. Manimaran
چکیده

In point-to-point networks, real-time services are supported by sending real-time streams over guaranteed or best-effort channels [1]. A stream consists of packets moving across individual links on the point-topoint network from a given source to destination. For each link, a scheduler is responsible for determining which packets shall be transmitted according the queue of packets stored. For streams that can allow the occasional dropped packets, a (m,k)-firm guarantee may be used that states that for every k packets, the delay requirements of at least m packets have to be satisfied. When a stream fails to meet this (m,k)-firm guarantee, a condition known as dynamic end-to-end failure occurs, thus vastly reducing the usability of the data. For real-time scheduling, the use of schemes such as Earliest Deadline First (EDF) and Least Laxity First (LLF) do not provide adequate support for the (m,k)firm guarantee method. For scheduling (m,k)-firm streams, best-effort schemes [3, 4] have been proposed in the literature with the objective of minimizing the dynamic failure. Initially in [3], Hamadaoui and Ramanathan proposed a scheduling policy named DBP (Distance Based Priority) which introduced the notion of an (m,k) state diagram to the scheduling scheme. In short, an (m,k) stream was given a priority based on its distance from failing, in terms of the number of transitions necessary to reach a failing state. The lower the distance from a failing state, the higher the priority. However, this initial DBP algorithm dealt with only single hop connections. To improve upon this, Lindsay and Ramanathan in [4] proposed DBP-M, a method for implementing DBP across point-to-point networks. DBP-M directly confronts the problem proposed by point-to-point networks by having packets transmitted onward until they have missed their overall deadline. Thus, although a packet may miss its local deadline, it may still have a chance of meeting its overall deadline across the pointto-point network. DBP and DBP-M assume a per flow queue at every node along the path of connections. This poses many problems when the number of connections increases, a large overhead is introduced to the scheduler and processor requirements can greatly increase. Suppose a given link has N streams flowing across it but only M queues available. If M >= N, DBP-M is applicable. Otherwise, if N > M, streams must be multiplexed onto queues thus undermining the primary assumption in DBP & DBP-M that each queue has a specific DBP state. This drawback is the principal motivation for this paper; in it, an integrated heuristic is proposed which will allow multiplexing of streams into queues.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Best-Effort Scheduling of (m, k)-Firm Real-Time Streams in Multihop Networks

In this paper, we address the problem of best-e ort scheduling of (m; k)rm real-time streams in multihop networks. The existing solutions for the problem ignore scalability considerations because the solutions maintain a separate queue for each stream. In this context, we propose a scheduling algorithm, EDBP, which is scalable ( xed scheduling cost) with little degradation in performance. The p...

متن کامل

Integrated Order Batching and Distribution Scheduling in a Single-block Order Picking Warehouse Considering S-Shape Routing Policy

In this paper, a mixed-integer linear programming model is proposed to integrate batch picking and distribution scheduling problems in order to optimize them simultaneously in an order picking warehouse. A tow-phase heuristic algorithm is presented to solve it in reasonable time. The first phase uses a genetic algorithm to evaluate and select permutations of the given set of customers. The seco...

متن کامل

Coordinating Order Acceptance and Batch Delivery for an Integrated Supply Chain Scheduling

This paper develops Order Acceptance for an Integrated Production-Distribution Problem in which Batch Delivery is implemented. The aim of this problem is to coordinate: (1) rejecting some of the orders (2) production scheduling of the accepted orders and (3) batch delivery to maximize Total Net Profit. A Mixed Integer Programming is proposed for the problem. In addition, a hybrid meta-heuristic...

متن کامل

A Comprehensive Study of Several Meta-Heuristic Algorithms for Open-Pit Mine Production Scheduling Problem Considering Grade Uncertainty

It is significant to discover a global optimization in the problems dealing with large dimensional scales to increase the quality of decision-making in the mining operation. It has been broadly confirmed that the long-term production scheduling (LTPS) problem performs a main role in mining projects to develop the performance regarding the obtainability of constraints, while maximizing the whole...

متن کامل

An integrated approach for scheduling flexible job-shop using teaching–learning-based optimization method

In this paper, teaching–learning-based optimization (TLBO) is proposed to solve flexible job shop scheduling problem (FJSP) based on the integrated approach with an objective to minimize makespan. An FJSP is an extension of basic job-shop scheduling problem. There are two sub problems in FJSP. They are routing problem and sequencing problem. If both the sub problems are solved simultaneously, t...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 1999