ONLINE APPENDIX for Operations Systems with Discretionary Task Completion

نویسندگان

  • Wallace J. Hopp
  • Seyed M.R. Iravani
  • Gigi Yuen
چکیده

• Decision epochs are the beginning of every period. • Action space includes Keep (K), Release & Work (RW), Release & Idle (RI) and Idle (I) for each server. The 16 unique combinations of the two workers’ actions constitute the system’s action space. Action “Keep” requires the worker to continue working on the current job for one more period. Action “Release & Work” requires that the worker stop working on the current job, and start a new job immediately. Action “Release & Idle” requires the worker to stop working on the current job and become idle for the next time period. Action “Idle” requires worker to remains idle for one more period.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Operations Systems with Discretionary Task Completion

Most performance evaluation models in operations management literature have assumed that tasks possess standardized completion criteria. However, in many operation systems, particularly in service and professional work, judgment is frequently required to determine when a task is completed. In thin paper, we show that introducing discretion in task completion adds a fourth variability buffer, qu...

متن کامل

Operation Systems with Discretionary Task Completion

Most performance evaluation models in operations management literature have assumed that tasks possess standardized completion criteria. However, in many operation systems, particularly in service and professional work, judgment is frequently required to determine when a task is completed. In thin paper, we show that introducing discretion in task completion adds a fourth variability buffer, qu...

متن کامل

Evaluating project’s completion time with Q-learning

Nowadays project management is a key component in introductory operations management. The educators and the researchers in these areas advocate representing a project as a network and applying the solution approaches for network models to them to assist project managers to monitor their completion. In this paper, we evaluated project’s completion time utilizing the Q-learning algorithm. So the ...

متن کامل

Evaluating project’s completion time with Q-learning

Nowadays project management is a key component in introductory operations management. The educators and the researchers in these areas advocate representing a project as a network and applying the solution approaches for network models to them to assist project managers to monitor their completion. In this paper, we evaluated project’s completion time utilizing the Q-learning algorithm. So the ...

متن کامل

Discretionary task interleaving RUNNING HEAD: DISCRETIONARY TASK INTERLEAVING Discretionary task interleaving: Heuristics for time allocation in cognitive foraging

When participants allocated time across two tasks (in which they generated as many words as possible from a fixed set of letters) they made frequent switches. This allowed them to allocate more time to the more productive task (i.e. the set of letters from which more words could be generated), even though times between the last word and the switch decision (“giving-up times”) were higher in the...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2005