Construction risk assessment on deep foundation pits due to confined water

نویسندگان

  • J. Ju
  • L. P. Xu
چکیده

The confined water is a very important risk source for deep excavation especially in saturated soft soils because failure in control measurements will lead serious consequence not only for the project itself but also for adjacent buildings. There are many risk sources that have close relation with the risks in deep excavation relating to the confined water. Based on the probability and losses of the risk sources, a risk assessment method is given to assess the construction risks combined with Analytic Hierarchy Process (AHP) and fuzzy synthetic evaluation. At last, the feasibility of this method is proved by a practical example.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Identification and Analysis of Metro Foundation Construction Safety Risk Based on Fault Tree Analysis

Fuzzy theory and Bayesian network theory were based on the fault tree. The fault tree analysis method improved the fault analysis to obtain number of event's exact problem. Considering the characteristics of the fuzzy risk analysis at the same time, it also solved the problem of scale fault analysis modeling. The theory is applied to the cost of construction shield tunnel risk analysis, floatin...

متن کامل

Environmental risk assessment of a dam during construction phase

The present study was conducted to assess the possible risks induced by construction of Gavi Dam in Ilam Province; western part of Iran, using MIKE-11 model and technique for order of preference by similarity to ideal solution. For this purpose, vulnerable zone of the dam site against the flooding risk of Gavi River was calculated for different return periods. The flooding zones were stimulated...

متن کامل

Assessment Optimization of Safety and Health Risks Using Fuzzy TOPSIS Technique (Case Study: Construction Sites in the South of Iran)

Introduction: Safety and health risk assessment in industries is associated with uncertainties due to the variables affecting it. Therefore, in this research, optimizing safety and health risk assessment was investigated in construction sites by combining a multi-criteria decision-making technique (TOPSIS) and a fuzzy system. In the present study, to answer this question, a new method was used ...

متن کامل

Safety risk assessment and ranking in the construction projects with F.M.E.A and fuzzy T.O.P.S.I.S

Abstract Introduction: Construction projects are one of the most important sectors of the economy of the country, which has a high capacity for job creation. Construction projects are part of a huge and strategic set of civil engineering projects that unfortunately have a large share of work-related accidents due to lack of attention to safety. One of the most important issues that can contrib...

متن کامل

Identifying Tools and Methods For Risk Identification and Assessment in Construction Supply Chain

The construction project is a business full of risk in every process due to its complexity, changes, and involvement from various stakeholders. One of the critical risks in the construction project is in the supply chain. Identifying and assessing the risk with the right tools and methods in that area will inevitably affect the success of the project. Unfortunately, the research for the tools a...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2007