Algorithms for railway crew management
نویسندگان
چکیده
Crew management is concerned with building the work schedules of crews needed to cover a planned timetable. This is a well-known problem in Operations Research and has been historically associated with airlines and mass-transit companies. More recently, railway applications have also come on the scene, especially in Europe. In practice, the overall crew management problem is decomposed into two subprob-lems, called crew scheduling and crew rostering. In this paper, we give an outline of diierent ways of modeling the two subproblems and possible solution methods. Two main solution approaches are illustrated for real-world applications. In particular we discuss in some detail the solution techniques currently adopted at the Italian railway company, Ferrovie dello Stato SpA, for solving crew scheduling and rostering problems.
منابع مشابه
Two Mathematical Models for Railway Crew Scheduling Problem
Railway crew scheduling problem is a substantial part of the railway transportation planning, which aims to find the optimal combination of the trip sequences (pairings), and assign them to the crew complements. In this problem, each trip must be covered by at least one pairing. The multiple-covered trips lead to impose useless transfers called “transitions”. In this study, a new ma...
متن کاملA Comprehensive Approach for Railway Crew Scheduling Problem (Case Study: Iranian Railway Network)
The aim of this study is to propose a comprehensive approach for handling the crew scheduling problem in the railway systems. In this approach, the information of different railway trips are considered as input and the problem is divided to three separated phases. In phase I, we generate all feasible sequences of the trips, which are named as the pairings. A depth-first search algorithm is deve...
متن کاملRailway Crew Rescheduling with Retiming
Railway operations are disrupted frequently, e.g. the Dutch railway network experiences about three large disruptions per day on average. In such a disrupted situation railway operators need to quickly adjust their resource schedules. Nowadays, the timetable, the rolling stock and the crew schedule are recovered in a sequential way. In this paper, we model and solve the crew rescheduling proble...
متن کاملAlgorithmic Support for Railway Disruption Management
Disruptions of a railway system are responsible for longer travel times and much discomfort for the passengers. Since disruptions are inevitable, the railway system should be prepared to deal with them effectively. This paper explains that, in case of a disruption, rescheduling the timetable, the rolling stock circulation, and the crew duties is so complex that solving them manually is too time...
متن کاملAn Iterative Framework for Real-time Railway Rescheduling
Since disruptions in railway networks are inevitable, railway operators and infrastructure managers need reliable measures and tools for disruption management. Current literature on railway disruption management focuses most of the time on rescheduling one resource (timetable, rolling stock or crew) at the time. In this research, we describe an iterative framework in which all three resources a...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- Math. Program.
دوره 79 شماره
صفحات -
تاریخ انتشار 1997