Workload Balancing Capability of Pull Systems in MTO Production
نویسندگان
چکیده
Pull systems focusing on throughput time control and applicable in situations with high variety and customization are scarce. This paper compares pull systems that can cope with such situations: POLCA and CONWIP. Both systems constrain the maximum amount of work in progress (WIP) within a loop, but their effectiveness in terms of reducing total throughput time is questioned. They mainly differ in the way routing variety in the shop is being handled. POLCA uses an authorization mechanism that uses route-specific capacity signals (POLCA cards). These signals level the maximum amount of WIP within a loop, where each loop connects two route segments. A CONWIP loop covers two or more operations. Several CONWIP loops can operate simultaneously, resulting in an m-CONWIP system with controlled release based on the actual progress of jobs on the shop floor. Theory states that an improvement of the average total throughput time will be due to the workload balancing capability of a release mechanism, but that many release mechanisms lack this capability. This paper shows this workload balancing capability to exist for POLCA and m-CONWIP, but not for CONWIP. The magnitude of the effect strongly differs, depending on the number of cards, utilization level, order arrival patterns and processing time variety of the orders.
منابع مشابه
Cycle Time Reduction and Runtime Rebalancing by Reallocating Dependent Tasks
Business Process Management Systems (BPMS) is a complex information system that provides designing, administrating, and improving the business processes. Task allocation to human resources is one of the most important issues which should be managed more efficiently in BPMS. Task allocation algorithms are defined in order to meet the various policies of organizations. The most important of these...
متن کاملارائه الگوریتم پویا برای تنظیم همروندی فرایندهای کسبوکار
Business process management systems (BPMS) are vital complex information systems to compete in the global market and to increase economic productivity. Workload balancing of resources in BPMS is one of the challenges have been long studied by researchers. Workload balancing of resources increases the system stability, improves the efficiency of the resources and enhances the quality of their pr...
متن کاملA New Multi-Objective Model for a Cell Formation Problem Considering Machine Utilization and Alternative Process Routes (RESEARCH NOTE)
This paper presents a novel, multi-objective mixed-integer nonlinear programming (MINLP) model for a cell formation problem (CFP) with alternative means. Due to existing contradiction among objectives, three are considered: 1) Minimizing the total cost consisting of; intercellular movements, purchasing, operation, and maintenance; 2) maximizing the utilization of machines in the system; 3) mini...
متن کاملMulti-site production planning in hybrid make-to-stock/make-to-order production environment
Today competitive environment has enforced practitioners and researchers to pay great attention to issues enhancing both production and marketing competitiveness. To do so, it has been obligatory for the firms to consider production side activities while customer requirements are on the other side of competition. In this regard, hybrid make-to-stock (MTS)/make-to-order (MTO) production systems ...
متن کاملLean Manufacturing on Make-to-order Suppliers: a Case Study
The lean manufacturing system has helped many companies to improve operational performance, mainly in the automotive and electronic supply chains. Although lean manufacturing revealed to be effective for repetitive systems, some small and medium suppliers, faced with high mix and low volume production, have had difficulty to implement the lean manufacturing. The main objective of this paper is ...
متن کامل