Incremental Propagation of Time Windows on Disjunctive Resources

نویسنده

  • Roman Barták
چکیده

Constraint-based techniques are frequently used in solving real-life scheduling problems thanks to natural modeling capabilities and strong constraint propagation techniques encoded within global constraints. In this paper we present new incremental propagation rules for shrinking time windows of activities allocated to a disjunctive resource. These rules use information about precedence constraints between the activities and support optional activities.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

کاربرد روش معادله سهموی در تحلیل مسائل انتشار امواج داخل ساختمان

With the rapid growth of indoor wireless communication systems, the need to accurately model radio wave propagation inside the building environments has increased. Many site-specific methods have been proposed for modeling indoor radio channels. Among these methods, the ray tracing algorithm and the finite-difference time domain (FDTD) method are the most popular ones. The ray tracing approach ...

متن کامل

Incremental Propagation Rules for a Precedence Graph with Optional Activities and Time Windows

Constraint-based scheduling is a powerful tool for solving real-life scheduling problems thanks to a natural integration of special solving algorithms encoded in global constraints. The filtering algorithms behind these constraints are based on propagation rules modelling some aspects of the problems, for example a unary resource. This paper describes new incremental propagation rules integrati...

متن کامل

Incremental Propagation Rules for Precedence Graph with Optional Activities and Time Windows

Constraint-based scheduling is a powerful tool for solving real-life scheduling problems thanks to a natural integration of special solving algorithms encoded in global constraints. The filtering algorithms behind these constraints are based on propagation rules modelling some aspects of the problems, for example a unary resource. This paper describes new incremental propagation rules integrati...

متن کامل

Disjunctive Constraints for Manufacturing Scheduling: Principles and Extensions

Disjunctive constraints are widely used to ensure that the time intervals over which two activities require the same resource do not overlap in time. Two types of extensions of disjunctive constraints are proposed: (1) extensions allowing the representation of more complex constraints including activities that may or may not require the resource, \state resources" to represent activities which ...

متن کامل

Solving Dynamic Rcpsp Using Explanation-based Constraint Programming

The Resource Constrained Project Scheduling Problem (rcpsp) is a general scheduling problem. It consists of a set of activities and a set of renewable resources. Each resource is available in a given constant amount. Each activity has a duration and requires a constant amount of resource to be processed. Preemption is not allowed. Activities are related by two sets of constraints: temporal cons...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2006