A Capacitated Production Planning Problem for Closed-Loop Supply Chain
نویسندگان
چکیده
This paper addresses a dynamic Capacitated Production Planning (CPP) problem in steel enterprise employing a closed-loop supply chain strategy, in which a remanufacturing process is adopted. We develop a model in which all demands are met by production or remanufacturing without backlogs, under the context that both the production and remanufacturing setup cost functions are arbitrary and time-varying. We also develop a corresponding genetic algorithm (GA) heuristic approach, and run a numerical simulation to test our algorithm’s efficiency by comparing with Branch and Bound method. The simulation results illustrate our algorithm’s accuracy and efficiency in large scale problems.
منابع مشابه
Mathematical Formulation and Solving of Green Closed-loop Supply Chain Planning Problem with Production, Distribution and Transportation Reliability
In this paper, developed a new multi-product, multi-period, and multi-level closed-loop green supply chain planning model under uncertain conditions. The formulated model consists of five objective functions, which minimize the cost of the supply chain, minimize the CO2 emission of transportation vehicles, maximize the reliability of manufacturing and distribution centers, maximize t...
متن کاملFuzzy Mathematical Model For A Lot-Sizing Problem In Closed-Loop Supply Chain
The aim of lot sizing problems is to determine the periods where production takes place and the quantities to be produced in order to satisfy the customer demand while minimizing the total cost. Due to its importance on the efficiency of the production and inventory systems, Lot sizing problems are one of the most challenging production planning problems and have been studied for many years wit...
متن کاملConsidering Pricing Problem in a Dynamic and Integrated Design of Sustainable Closed-loop Supply Chain Network
Flexible and dynamic supply chain network design problem has been studied by many researchers during past years. Since integration of short-term and long-term decisions in strategic planning leads to more reliable plans, in this paper a multi-objective model for a sustainable closed-loop supply chain network design problem is proposed. The planning horizon of this model contains multiple strate...
متن کاملSustainable closed-loop supply chain network design and operations planning considering human resource employment and training
Modeling and optimal solving of supply chain management problems lead to efficient decision making in strategic planning and supply chain operations, resulting in a competitive advantage. Today, with the planning of a sustainable supply chain, in addition to achieving economic goals, it is possible to meet social and environmental objectives and considerations. This research deal with sustainab...
متن کاملA Mixed Integer Linear Programming Model for the Design of Remanufacturing Closed–loop Supply Chain Network
Closed-loop supply chain network design is a critical issue due to its impact on both economic and environmental performances of the supply chain. In this paper, we address the problem of designing a multi-echelon, multi-product and capacitated closed-loop supply chain network. First, a mixed-integer linear programming formulation is developed to maximize the total profit. The main contribution...
متن کامل