Interaction between control and design of a SHARON reactor: economic considerations in a plant-wide (BSM2) context.
نویسندگان
چکیده
The combined SHARON-Anammox process is a promising technique for nitrogen removal from wastewater streams with high ammonium concentrations. It is typically applied to sludge digestion reject water, in order to relieve the activated sludge tanks, to which this stream is typically recycled. This contribution assesses the impact of the applied control strategy in the SHARON-reactor, both on the effluent quality of the subsequent Anammox reactor as well as on the plant-wide level by means of an operating cost index. Moreover, it is investigated to which extent the usefulness of a certain control strategy depends on the reactor design (volume). A simulation study is carried out using the plant-wide Benchmark Simulation Model no. 2 (BSM2), extended with the SHARON and Anammox processes. The results reveal a discrepancy between optimizing the reject water treatment performance and minimizing plant-wide operating costs.
منابع مشابه
Plant-wide (BSM2) evaluation of reject water treatment with a SHARON-Anammox process.
In wastewater treatment plants (WWTPs) equipped with sludge digestion and dewatering systems, the reject water originating from these facilities contributes significantly to the nitrogen load of the activated sludge tanks, to which it is typically recycled. In this paper, the impact of reject water streams on the performance of a WWTP is assessed in a simulation study, using the Benchmark Simul...
متن کاملرویکرد ارگونومیک در طراحی محصولات و چالش های پیش رو
Introduction: The importance of product design has been dramatically increased in recent years due to economic considerations as well as changes in user preferences, policy making and legal needs. In response to this, and as one of the most influential branches in the field of product design (in terms of the fit between product and user), ergonomics has also been developed proportionally. The a...
متن کاملPlantwide Control for Economic Operation of a Recycle Process
Plant-wide control system design for economically optimum operation of a recycle process with side reaction is studied. The process consists of a liquid phase CSTR followed by two simple distillation columns. The exothermic irreversible reactions A + B → C (main reaction) and C + B → D (side reaction) occur in the CSTR. The reactor effluent is distilled in the recycle column to recycle the ligh...
متن کاملBenchmark simulation Model no 2 in Matlab-simulink: towards plant-wide WWTP control strategy evaluation.
In this paper, implementation of the Benchmark Simulation Model No 2 (BSM2) within Matlab-Simulink is presented. The BSM2 is developed for plant-wide WWTP control strategy evaluation on a long-term basis. It consists of a pre-treatment process, an activated sludge process and sludge treatment processes. Extended evaluation criteria are proposed for plant-wide control strategy assessment. Defaul...
متن کاملBenchmark simulation model no 2: general protocol and exploratory case studies.
Over a decade ago, the concept of objectively evaluating the performance of control strategies by simulating them using a standard model implementation was introduced for activated sludge wastewater treatment plants. The resulting Benchmark Simulation Model No 1 (BSM1) has been the basis for a significant new development that is reported on here: Rather than only evaluating control strategies a...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- Water science and technology : a journal of the International Association on Water Pollution Research
دوره 56 9 شماره
صفحات -
تاریخ انتشار 2007