Parallel Programming for Everyone

نویسنده

  • Naftali D. Schwartz
چکیده

This article proposes a novel architectural model which augments the latest developments in automatic program parallelization and distributed systems to achieve a level of practicality as yet unknown to either eld. Today's premier automatic parallelization model is well suited to implementation on a network of commodity workstations (NOW) using only a very thin layer of software support. We describe a paralleliz-ing compiler framework which greatly simpliies the parallelization of even highly complex sequential applications while producing extremely eeective parallelizations for the NOW. We further show how our model greatly enhances programmer productivity through the use of minimally invasive C++ transformation techniques, aiding both debugging and portability.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A fuzzy mixed-integer goal programming model for a parallel machine scheduling problem with sequence-dependent setup times and release dates

This paper presents a new mixed-integer goal programming (MIGP) model for a parallel machine scheduling problem with sequence-dependent setup times and release dates. Two objectives are considered in the model to minimize the total weighted flow time and the total weighted tardiness simultaneously. Due to the com-plexity of the above model and uncertainty involved in real-world scheduling probl...

متن کامل

Fuzzy Programming for Parallel Machines Scheduling: Minimizing Weighted Tardiness/Earliness and Flow Time through Genetic Algorithm

Appropriate scheduling and sequencing of tasks on machines is one of the basic and significant problems that a shop or a factory manager encounters; this is why in recent decades extensive studies have been done on scheduling issues. One type of scheduling problems is just-in-time (JIT) scheduling and in this area, motivated by JIT manufacturing, this study investigates a mathematical model for...

متن کامل

Two-stage fuzzy-stochastic programming for parallel machine scheduling problem with machine deterioration and operator learning effect

This paper deals with the determination of machine numbers and production schedules in manufacturing environments. In this line, a two-stage fuzzy stochastic programming model is discussed with fuzzy processing times where both deterioration and learning effects are evaluated simultaneously. The first stage focuses on the type and number of machines in order to minimize the total costs associat...

متن کامل

Fuzzy Programming for Parallel Machines Scheduling: Minimizing Weighted Tardiness/Earliness and Flowtime through Genetic Algorithm

Appropriate scheduling and sequencing of tasks on machines is one of the basic and significant problems that a shop or a factory manager encounters with it, this is why in recent decades extensive researches have been done on scheduling issues. A type of scheduling problems is just-in-time (JIT) scheduling and in this area, motivated by JIT manufacturing, this study investigates a mathematical ...

متن کامل

Improving the Energy Management of Parallel Hybrid Electric Vehicle by Dynamic Programming Using Electro-Thermal Model of Battery

In this paper, an offline energy management system (EMS) is proposed for parallel hybrid electric vehicles (HEVs). The proper energy management system is necessary for dividing torque between electrical motor and Internal Combustion Engine (ICE). The battery is a crucial component of hybrid electric vehicles and affects significantly the cost and the performance of the whole vehicle. The primar...

متن کامل

Redundancy Allocation Combined with Supplier Selection for Design of Series-parallel Systems

In this paper a redundancy allocation problem is studied where for the first time the supplier selection is taken into consideration and redundant components are provided from appropriate suppliers with the most suitable offers such as discount on buying price of components, warranty length for components, things like that, so that the system reliability, profit and the warranty length proposed...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2007